GUARD PUBLISHING COMPANY LIAR 242008 <br /> ` P.O. BOX 10188 PHONE (541) 485-1234 <br /> EUGENE, OREGON 97440 Legal 3183328 <br /> Notice <br /> Legal Notice Advertising <br /> CITY OF EUGENE ) <br /> PUBLIC WORKS -ENGINEERING ~~n~~~ i~ <br /> ATTN -LYNN BROGDEN <br /> 244 E. BROADWAY <br /> EUGENE, OR 97401 <br /> AFFIDAVIT OF PUBLICATION INVrrArIDNFOR'BIDs <br /> CiTY OF EUGENE, EFiGENE AIRPORT: <br /> } 2008 REH ABP 3~1-0018,40 H RAMP <br /> STATE OF OREGON, ss Eu ne, Oregon <br /> COUNTY OF LANE, } Pro~ectNo.4530 <br /> ADYERTISEMENTFORBID N0.7 <br /> I Kell Gant bein first dui affirmed de OSe bids for 2008 Rehabgitation Soutfr Ramp at the Eugene <br /> Y ~ 9 Y ~ P Airport;.City Jolt No: A530 will be receiged at City of Eugene, Pubbc <br /> and say that I am the Advertising Manager, or his principal clerk, of Works Engineering D&ision, 244 E Broadway, Eugene, Oregon 97401 <br /> until 2:00 p.m., prevailingaocal time, on Thursday, April 17, 2008. <br /> The Register-Guard, a newspaper of general circulation as defined Bldswlllbepubllclyopened`andreadaloudbytheundersignedorhis <br /> designated representative at 2.05 p.m:,prevalling local time on April <br /> in ORS 193.010 and 193.020; published at Eugene in the aforesaid 1T, zoos. <br /> count and state; that the Re UE!St for Bids DESCRIPTION: Construction Of 7,937 CYUnclassffied Excavation, <br /> Y q 12,981 SY Geoteztlle fabric, 12,981 SY 10".Subbase Coukse, 12,981 <br /> tinted co of which is hereto annexed, was ublished in the entire SY 4^ Base Course, 4,500 TN:HMAC,:252 fT Remove and Replace <br /> P PY P Valley.Gutter,.33 EA Tie;Downs, 2 EAJUnction Box, 1000 Fr 3" Elec- <br /> issue of said newspaper for one successive and consecutive tricahPUC conCuit, soo Fr.z" SCH 4o PVC Water Ling 500 Ft 4" SCN <br /> 40 PYC Pressure Pipe, 225 F'r~1tt" Concrete Storm Plpe, l EA Aircraft <br /> Day(s) In the follOWing ISSUeS: Rated Manhole onExlstingPipes,and1;500SFPavemenLMarlung: <br /> Work on 2008 Rehabilitation South Ramp shall start no earlier <br /> than Juty 8, 2006, and shall be cgmpleted by Sepptember 13, 2008, <br /> March 20 2008 Ugdldated damages will be charged at a rate of $500.00 per day <br /> ~ should the contractor fail to complete'the work wfthin the time lim- <br /> .its specffied. <br /> PRE BID MEETING All Interested parties are invked to attend a <br /> nod;tnandatory.:pre•bid meeting to beiheld on Thursday, April 3, <br /> ~ ~ ~ ~ 2006; at 11.00 a.m at the. Eugene Airport, Administration Building, <br /> a ~ ~ ` a 6J p w 28655 Lockheed Drive, Eugene, Oregon..Atthough the Pre-bid meet- <br /> ~ t ~..o~' C ing is not mandatory, k will tx• the only oppportunity for bidders to re- <br /> ~ ~ view the protect site. Special site visits before"or after this. meeting <br /> will not be considered. <br /> BID SECURITY: Bidder shall submft a Bid-Bond, Certified Check, <br /> Cashier's Check, Savings & Loan Secured -Check, or irrevocable <br /> Letter of Credit Issued bya financial institution for ten percent (10%) <br /> of the Base Bid andAddkive ARematives, ff apy. <br /> CONSTRUCTION DOCUMENTS: Drawings and Specfirations, <br /> incluiling Bidding Aocuments and Agreemenbmay be examined at <br /> ~ r the following locations: <br /> Central Oregoh Builder's Exchange, Bend, OR, (541) 389.0123 <br /> p _ DailyJouraal of Commerce Plan Center Portland, OR, <br /> -l~Jj`'Jl (503) 274-0624 <br /> Douglas County Plan Center,'Roseburg OR, (541) 440-9030 <br /> Eugene Builders Exchange, Eugene, OR, (541).484-5331 <br /> McGraw Hlll Construction Dodge Plan Center, Portland, OR, <br /> (503)223-3012 <br /> .Oregon Contractor Plan Center, Clackamas,AR, (503) 650-0146 <br /> ' Reed Construction Data, (303) 470-3650 <br /> Salem Contractors Exchange, Salem; OR, (503) 362.7957 <br /> Willamette Valley Bid Center, Tangent; OR, (541) 928-5159 <br /> Builder's Exchange Washington, Everett, WA , (425) 743.3244 <br /> Valley Plan Center; Kent, WA;{253) 852-1090 <br /> Prime Bidders. may obtain bidding doaments by phone or in <br /> person from the City of Eugene upon payment of anon-refundable <br /> fee of S20.o0 plus $6SO postage. For any questions regarding ,this <br /> project please call (541) 682-5560 or use our Engineering bid Wetisfte <br /> www.eugene-or.gov/PW to review Plans and Specifications. <br /> =NONRESIDENT BIDDERS: In accordance wRh ORS 279.029; <br /> Bltlders will be required to Indicate on the-Bid .Form whether ornot <br /> the Bidder Is an Oregon resident <br /> CONTRACTOR'S REGISTRATION: Bids will -:not be . considered, ' r' <br /> unless, the Bidder is registered with. the Construction Contractors <br /> Subscribed and affi e o efore me this March 21, 2008 Boatd as required byoRS 7ol.oss. <br /> WAGE RATES: Contractor Is subject to payment ,of higher <br /> .prevailing -rate- of wages, efther Davis-Bacon Act (40 US.C.276a) <br /> ~ and/or BOLT ORS 2T9C.8D0 to 2T9C.8T0. No bW will be received or <br /> i r~ considered unless the bid contains a:statement by the bidder that; <br /> Notary Public of Oregon ~o°,a i~d wim40 U.S.C.276a or ORS 279C.8D0 to279C.870 shall be' <br /> '.DISCLOSURE" OF' FlRST-TIER SUBCONTRACTORS: Bidders 'are <br /> required to sutimlt, wtth~all bid proposal'documents prior to thebid' <br /> My commission expires: July 24, 2010 ORSn29027 <br /> tlFOfre~thls~project,~tNeSuFi~rstnT~i ~o5ubcontractors <br /> Dl3closure Statement- must be submitted regardless of'the bid' <br /> <br /> _ amount <br /> ACCOUnt 1 OOOLOS EMPLOYEE DRUG TESTING PROGRAM: Pursuant to `ORS <br /> 279.312(2), all contractors and subcontractors working on public <br /> INVOICE 8.3328 Improvement contracts shall demonstrate tfiat an employee drug <br /> testing program is In place. A certificate of Bidder/Contractor of <br /> Employee Drug Testing Policy shalt tie submitted wRh thebld. <br /> Case: Eugene Airport 2008 Rehabilitation South Raml The proposedconhactissubjecttotnefollowingregulations: <br /> 1. The proposed contract is under and subject to ExecutiveArder <br /> 11245 of September 24, 1986 and to the Equal Employment <br /> Amt Due: $497.50 Opportunittyry(EEO)andFederafl.aborProvislons. <br /> 2. All laboron the project shall be paid no less than the minimum <br /> wage rates esWWtshed by the U.S. Secretary oYLabar. <br /> 3. Each. Bidder-must=supply all lhfomwtlon required by the bid' <br /> documents and;specffications. <br /> <br />