: City of Eugene Cor~traCt ~CC9-0~~3~
<br /> Exhibit C-Proposal Cost Breaic~own
<br /> Sl~ppl~rn~nt
<br /> Proposal Cos[ Breakdown Supplemental Sheet
<br /> Crtaru~~[rve
<br /> • ~+ra++r+ty ~1r~Jts Rare Subtotals Totr~t
<br /> Prafect lWanayemenk
<br /> Senior Prnjerr Engineer 14 hours S 13].00 S 1,314.00
<br /> Traffic Control Plans • 5ubcontractar ~ 3 each 5 X50.44 i 750.00
<br /> Mileage 154 miles S 4.54 S 90,00
<br /> Per Diem t days S 135.00 S 135,00
<br /> S 2,345.00 S 2,345.Q0
<br /> Distress Sorvcy i~or ?4ff Roads
<br /> Sensor Project Engineer 10 hours S 137.00 # 1,370,00
<br /> f+~ileage 300 miles S 0.50 # 180.00
<br /> S 1,550.00 $ 3,99S.1a0
<br /> FWfJ Mabili~atiotr and Per Diem
<br /> Staff Engineer Ili ~ hours x 105.00 S 530.00
<br /> fl~leage 304 miles # 0 50 S 180.00
<br /> f'er Diem 2.5 days S 135,00 # 33.50
<br /> S 1,141,50 S 5,042.50
<br /> Coring 14obllization and Per Diem
<br /> Staff Engineer III 5 hours S 145.00 S 530,04
<br /> Mileage 300 miles $ 4.60 S 180,00
<br /> Per Diem 4 days f 135.00 S 540,00
<br /> S 1.350.00 S 5,392,50
<br /> 01 karlaw from Coburg Raad to I-5 Overpass 54T$ feet Cores 12
<br /> On Sire FWD resting ar~d rearing ~ lines FWD 110
<br /> FWD Unit I;indude~ Stafif engineer) 1.0 each 5 f ,500.00 # 1,500.00
<br /> 5tafi Engineer III (care lagging) 1 ~.4 hours S 105.00 S 1,3f~5.00
<br /> Flagging Subcontractor includes 12f6 markup) ~ Q earh S 850.00 # 1,100.00
<br /> Drilling Subcontractor [in[Itrdes 1296 markup) 1.5 each $ 1,250,00 S 1,875.00
<br /> Data Reduction and drrafy~r'f
<br /> 5eniar Project Engineer 11 0 hours S 131,00 S 1,54T.00
<br /> I.abar~rory Tarring
<br /> Mois[ure Content l 2.0 earh 3 12.00 # ! 44.00
<br /> Wash Steve Analysis 3.1a each S 90.00 $ 240.00
<br /> A[xerberg Limits 2.0 each S 145.Op $ 210.00
<br /> Report Preparation
<br /> Prinr:ipal Engineer freriew} 2 0 hour i 159.00 S 338.00
<br /> Senior Prajert Engineer 13.0 hours S 137,00 S 1,761.00
<br /> Drafting 5.0 hours 4 90.00 # 400.00
<br /> Project Assistant t}.0 hours S 10.00 # 820.00
<br /> 5uppan Staff 4.4 hours # 55 00 # 120.00
<br /> Subtotal 511,100,00 3 18,092,50
<br /> 02 River Raad Pram Horn to Railroad 5541 feet Cores 20
<br /> On Sire F4~+D testing and Cpri~ry 4 lanes FWD 252
<br /> FVYQ tlnir {includes staff englneer~ 2.5 each S 1.540.00 S 3,750.00
<br /> 51aff Engineer III {rare logging} 22,0 haur~ 3 145.f)+7 # 2,310.00
<br /> Flagging 5ubcantrartor (includes 1296 markup) 3.5 earh 5 850.00 S 2,915.00
<br /> Drilling 5ubrantrartor finclude~ l 2fd rnarkupa 2.5 each 5 1,250.00 # 3,125.00
<br /> Dana Reductipra a~dArr~lytis
<br /> 5eniar Project Engineer 14.0 haute; f 137.00 S 1,918,00
<br /> LQbprarpry TC5tll}g
<br /> Aiais[ure Content Z0 0 each S 12-00 S 244.00
<br /> Wash Sieve Analysis 5.0 each $ 80.00 S 440.00
<br /> Atterberg Limits 3,0 each 5 145.00 S 3 t 5.f10
<br /> Report Pr¢parpt~ipn
<br /> Pnnr~pal Engineer preview) Z.0 hour S 154.40 S 338.00
<br /> 5e,niar Project Engineer 18.0 hours # 137 0D S 2,455,00
<br /> (rafting 7 0 hours # 8f?.4a 5 550,00 I
<br /> Prajert Assistant f} 0 hours f 10 44 S 420,00 '
<br /> 5upport5taff 5 0 hours # 55.44 i 215.00
<br /> Subtotal # 19,097.00 # 37,194,50