Laboratory and Field Testing Co, <br /> Page 3 <br /> Portland Cement Concrete: <br /> Coal Per <br /> Descrpuon Of Test Teat <br /> Compressive Strength. ('I'22/'I'M716 & 719) $17.00 <br /> Beam breaks, (T22) $29.00 <br /> Mix Design. (TM718) $1,792.00 <br /> Cement Treated Base, CTB Deaiga (TM126) $838.00 <br /> Mortar Cubes Compressive Strength {6ea.} (T106/I•M701) $17.00 <br /> <br /> Field Testlne Aad Insoec8on: <br /> All 5eld Testing and inspection will be charged by the actual man-hours requued to perform the work An Average Rate of <br /> 557.81 may be used for estimating purposes (T'he actual rate will vary). A minimum of one (1) man-hour should be assumed <br /> for all field work VeWcle rates apply per hourand vary s8ghtly, averaging 56.45 per hour. <br /> Description of Test <br /> Field Density Testing of Soils, Aggregate and Asphalt Concrete: <br /> Nuclear Gauge (T238 & T239, TM160, TM310C), Sand Coae (T'191). <br /> Field Density Control Tazget Sttip ('I'M306C). <br /> Coring of Asphalt Pavements, 4" or 6" Din <br /> Field Testing and Inspection of Concrete: QCT, CCT, Casting Cylinders, Slump, Air Content, Unit Weight and Yield <br /> Cement Mortar (.tithes Casting (T106). <br /> Deflection Testing, Beakebma Beam -Requites an 18kip axle truck with driver and two flaggera for traffic wntrol. <br /> 1 AO travel and/or standby time will be charged at current hourly mte for the individual ('s) involved <br /> 2 <br /> TratLc watrol is not included in the estimated costs. For estimating Purposes use m hourly rate of 557.81 per mao-hottr. <br /> 4 Please call for an estimate if the test you wish is not shown above. <br /> 5 Test numbers designated by'T' indicate AASHTO teat procedures and'°I'M" indicates ODOT or WAQTC test <br /> procedures. <br /> <br />