Comment 2: The rtion of the second sentence of the first . aza ra h of R-7.280- <br /> Po P g P <br /> A that states "Street trees shall be ...required on streets that abut the development <br /> should be more clearly defined. <br /> Findin The dictionary defines "abut" as "having a common boundary or to <br /> border upon". In order to clarify the intent of this section, it has been modified to provide <br /> that "Street trees shall be ...required on that portion of street right-of-way that abuts lots <br /> within the development." <br /> Comment 3:.With respect to the location requirements of R-7.280-C.5, it is <br /> impossible to know whether a customer would prefer a left hand driveway or a right hand <br /> driveway until a particular lot is chosen and sold. Locations of all utilities at the time of <br /> plan approval can only be estimated.. There should be a variance provision subject to <br /> relocation based on actual construction working drawings, which are not completed until <br /> the developer is ready to begin street construction. <br /> Finding: The. Local Street Plan establishes that the primary location for utilities <br /> <br /> . shall be within the public utility easement immediately outside the right. of way. If that <br /> location is infeasible, then the utilities may be located under the sidewalk, or within the <br /> street. Only as a last resort may utilities be placed within the area reserved for trees. <br /> However, R-7.280-C.5 has been revised and language added to allow review and <br /> conditional approval of estimated locations of utilities and driveways in some cases. <br /> Comment 4: Under R-7.280-B.1, there is no mention of developmental phases. <br /> ..;.Most lazge developments are completed in phases. The Street Tree Plan should be tied to <br /> these phases. <br /> Finding:. The land use development process currently allows various ways this <br /> can be accomplished. The Code requires the approval of the developer's Street Tree Plan <br /> prior to final approval of the development. Most developers approach a large development <br /> by requesting approval for each phase as they are ready to proceed. In doing so these <br /> street tree provisions would only apply to the phase of development ready to proceed. <br /> A Planned Unit Development (PUD) final approval is good for a maximum of three. <br /> yeazs, so at most,. a developer could only phase construction within that approved PUD <br /> which .could be completed within that time frame without returning for another approval. <br /> Another alternative would be for a developer o bring in a large PUD and receive tentative <br /> approval on the larger development but then bring in each phase separately for final <br /> ..approval. Therefore, the development process already has mechanisms in place to allow <br /> final approval to be based on development phases, and no modification of the rules is <br /> necessary. <br /> Comment 5: The location standards of R-7.280-C.1 should read "shall average as <br /> closely as possible to 30 curb feet on center with consideration for driveways and credits <br /> or waiver granted by the City Manager, Urban Forester, or Public Works." <br /> Finding: The rules identify the desired spacing of trees to be on an average of 30 <br /> Street Tree Plan Agreement -City Plants Alternate - 7 of 25 ~ ~ w. <br /> <br />