ARTICLE 1.1 INITIAL INFORMATION <br /> § 1.1.1 This Agreement is based on the following information and assumptions. <br /> (Note the disposition for the following items by inserting the requested information or a statement such as "not <br /> applicable, " "unknown at time of execution" or "to be determined later by mutual agreement. <br /> § 1.1.2 PROJECT PARAMETERS <br /> § 1.1.2.1 The objective or use is: <br /> (Identify or describe, if appropriate, proposed use or goals.) , <br /> Public Works crew rooms. offices, showers restrooms exercise room and related stora e <br /> § 1.1.2.2 The physical parameters aze: <br /> (Identify or describe, if appropriate, size, location, dimensions, or other pertinent information, such as geotechnical <br /> reports about the site.) <br /> The extiansion is to be located west of existing Building 6 Geotechnical Report prepared by Squire Associates <br /> dated September 3..1991 for the existin buildin ig s to Drovide basis for design <br /> § 1.1.2.3 The Owner's Program is: <br /> (Identify documentation or state the manner in which the program will be developed.) <br /> <br /> I As described in WBGS memo of November 2 2004 and as amended in meeting minutes dated Mazch 2 and March <br /> 11.2005. <br /> § 1.1.2.4 The legal parameters are: <br /> (Identify pertinent legal information, including, if appropriate, land surveys and legal descriptions and restrictions <br /> bf the site.) <br /> .1 Proiect shall. be eoverned by the rules regulations laws and ordinances of the City of Eu eg ne Applicable <br /> State and Federal rules. regulations. laws and ordinances shall also apply <br /> .2_ Refer to site survey and any amendments/modifications pre azed by surveyor for description of site <br /> boundaries. <br /> § 1.1.2.5 The financial parameters are as follows. <br /> .1 Amount of the Owner's overall budget for the Project, including the Architect's compensation, is: <br /> 975 000 <br /> .2 Amount of the Owner's budget for the Cost of the Work, excluding the Architect's compensation, is: <br /> $730.000, including construction contin ency <br /> § 1.1.2.6 The time pazameters are: <br /> (Identify, if appropriate, milestone dates, durations or fast track scheduling.) <br /> The following are the project andcinated milestone completion dates for the Work indicated• <br /> Time Parameter /Progress Deadlines <br /> Schematic Design May 27 2005 <br /> Design Development July 1 2005 <br /> u tT11t ut tn~ ermit ugust ' ' UUS _ - _ - <br /> It is understood that City staff needed to provide information and guidance for the design occasionally will be <br /> unavailable and that the Architect shall plan and coordinate to obtain the necessary information and guidance needed <br /> to accomplish these deadlines. <br /> § 1.1.2.7 The proposed procurement or delivery method for the Project is: ' <br /> (Identify method such as competitive bid, negotiated contract, or construction management.) <br /> Competitive Public Bid Process which may include additive and/or deductive alternates and unit costs <br /> AIA Document B141TM -1997 Part 1. Copyright ©1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The <br /> American Institute of Architects. All rights reserved. WARNING: This AIA'° Document is protected by U.S. Copyright Law and International Treaties. 2 <br /> Unauthorized reproduction or distribution of this AIA` Document, or any portion of it, may result in severe civil and criminal penalties, and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:10:48 on 05/06/2005 under Order <br /> No.1 0 0 01 573 50_1 which expires on 10/5/2005, and is not for resale. <br /> User Notes: (2107969202) <br /> _ _ <br /> <br />