New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY00 SB3
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2008
>
FY00 SB3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2010 12:53:59 PM
Creation date
1/9/2009 9:25:07 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2000
PW_Division
Administration
Identification_Number
SB3FY00
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6GIij2~ ~Y ~ Attachment B <br /> LIBRARY FINANCING PLAN <br /> The estimated cost of the library construction project, including the expansion space and the <br /> parking, is approximately $32.2 million, as of February 2000 (see Attachment A, "Current Status <br /> of Project"). The following chart sets out the plan for financing this project. Following the chart <br /> is an explanation of each of the resources. <br /> Estimated Resources <br /> (as of February 2000) <br /> Bonds: Backed By Urban Renewal Funds $18,500,000 <br /> Backed by Net Freed-Up Lease Payments 4.400.000 <br /> Total Bonds $22,900,000 <br /> Library Foundation Fundraising 4,000,000 <br /> Library Local Option Levy 1,935,000 <br /> Sale of Assets: Existing Library 1,400,000 <br /> Olive Street Parking Lot 300,000 <br /> Sears Building 550,000 <br /> Total Asset Sales 2,250,OQ0 <br /> Urban Renewal Cash Contribution in FY00 500,000 <br /> Miscellaneous: Library Trust Fund 340,000 <br /> Interest Earnings 150,000 <br /> Other 154,000 <br /> Total Miscellaneous 644.000 <br /> TOTAL ESTIMATED RESOURCES $32,229.000 <br /> Please note that all resources are estimates as of February 2000. It is likely that some of these <br /> financing resources could change over the construction period. <br /> BONDS <br /> <br /> It is expected that two series of bonds will be issued to finance the library project. The bonds <br /> will be issued by the City of Eugene, and will be self-supporting from dedicated revenue sources. <br /> The bonds will also be secured by the City's General Fund. They will be called "Library Full <br /> Faith and Credit Obligations." <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.