4 <br /> CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Jab # 3984 <br /> Contract # 2008.25 <br /> CONTRACTOR: Emery and Sans Construction, Inc. Change Order # 1 <br /> (ADDRESS) PO i3ox 398 Date: 12/24/08 <br /> Staytan, OR 97383 CAMS Date: <br /> Reviewed by: Date: <br /> PROJECT: Paik Street Water Qualit Vault Inspector: Glen A. Fee <br /> Proj, Mgr. Ter Colvin <br /> Principal Eng. Paul Klo e <br /> You are directed to make the fallowing changes in this contract: <br /> Contract <br /> Item <br /> No. <br /> 320 Contractor is directed to da a Gore Drill Excavation to locate voids in restressed concrete slabs in roof of existin vault to facilitate location of 6'x6' hatch. <br /> 330 Contractor is directed to construct reinforced concrete wall su orts and ram s for 6'x6' hatch in roof of existin vault. <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Tlme Quantity Unit Amended Net <br /> No. Item Change (Units} Cost Amount (+1-} Change Change <br /> 320 Care Drill Excavation Ori final 0,00 aA0 0.00 $0.00 <br /> Revised 0,00 0.00 0.00 <br /> Amended 1.00 L5 $2,919A2 $2,919.02 $2,919.02 <br /> 330 6'x6' Hatch Adjustment Ori final 0.00 O.OD O.oa $OAO <br /> Revised 0.00 0.00 D,oa <br /> Amended 1.D0 LS $9,261.09 $9,261.x9 $9,261.09 <br /> Ori final 0.00 a.aa a,Da $0.00 <br /> Revised 0.00 0.00 O.aO <br /> Amended 0.00 $O,Dx $0.00 $0.00 <br /> Ori final 0.00 O.OD 0.00 $OAO <br /> Revised O.aO 0.00 0,00 <br /> Amended O.aO $O.aO $O.aO $0.00 <br /> on final o.ao o.aa o,aa $o.oo <br /> Revised D,DO 0.00 O,DO <br /> Amended 0.00 $0.00 $0.00 $0.00 <br /> Ori final 0.00 0.00 0.00 $D.00 <br /> Revised O.DO 0.00 O.DD <br /> Amended 0.00 $0.00 $0.00 $0.00 <br /> The original contract work days are 0.0 da <br /> The contract time change this C.0 x.x da <br /> The contract time change by previous C.O.'s o.x da <br /> The new contract work da s are o.o days <br /> The original contract sum was $773,581 AO <br /> Net change by previous change order x.00 <br /> Net change due to amendment by previous change order ~x.ax <br /> The contract sum prior to this change order was $773,5s1.aa <br /> This change order will change contract sum by this amount $12,18x.11 <br /> The new contract net change sum ~x.oo <br /> The new contract amendment sum $12,18D.11 <br /> The new contract sum including this change order will..~~ $785,761.11 <br /> Percenta a of on final contract 1.57°l0 <br /> NET CHANGE DUE TO AMENDMENT5 ~,57a/o <br /> <br /> Approval b <br /> Ci Eng Weer Prime Contractor Third Party <br /> Date Date Date <br /> CONTRACTOR ~ OFFICE FILE ~ PURCHA5INGICRO <br /> QIFORMSIPROJECTICONSTIREVISEDCHANGE ORDER.XLS <br /> <br />