STREET LIGHT CONSTRUCTION NOTICE - <br /> AGENCY: CITY OF EUGENE EWEB DRAWING B-24047 <br /> EWEB MAP E-18T <br /> <br /> - DATE: March 15, 2006 <br /> City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capital) <br /> The Eugene Water & Electric Board contemplates equipment changes or additions that will affect your <br /> street light equipment. These plans are outlined below and shown on the attached drawing: <br /> EWEB CONSTRUCTION PLANS <br /> TRANSFER OF ST. LIGHT ON POLE 13315 PER DRAWING B-24047 <br /> Developer's Name: EWEB Eugene Water & Electric Board <br /> Telephone <br /> COE Rep=s Name: o~ .fit-S'r'~~t~ Prepared By: LINDAWOLFE <br /> Telephone L kL • f/f ~ ~ Telephone 684-4774 <br /> PO Z oa(QO ~6 3 ~ GJN <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton <br /> Electric Distribution Supervisor <br /> 1. Connect (high pressure sodium) street lights as per attached drawing and bill $/month as per <br /> EWEB J-4 street light schedule. <br /> 2. This company (will/will not) be interested in this ditch for joint use. <br /> 3. This company (will/will not) be interested in this pole(s) for joint use. <br /> Preliminary billing is as follows: <br /> EWER to bill: CITY OF EUGENE for the following work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: TRANSFER ST. LIGHT OVER 10' ARM $ 123.00 <br /> Total: $ 123.00 <br /> Agency: C~c~~; l Authorized By: Date: 3 "Z l" o <br /> Eugene Water & Ele tric Board: <br /> ti <br /> Authorized By ~ ~ Date: <br /> 8/15/03 <br /> _ _ <br /> <br />