l <br /> STREET LIGHT CONSTRUCTION NOTLCE <br /> AGENCY: EWEB DRAWING g'~~~D¢' <br /> EWEB MAP E- ~ <br /> City of Eugene-PWM (Maintenance) DATE: May 31, 2006 <br /> City of Eugene-PWE (Engr/Capital) <br /> The Eugene Water & Electric Board contemplates equipment changes or additions that will affect your <br /> street light equipment. These plans are outlined below and shown on the attached drawing: <br /> EWEB CONSTRUCTION PLANS <br /> Develorer's Name: Ci ~ ~ ~ Eugene Water & Electric Board <br /> Telephone ~ 2-~j ~ ~ Prepared By: <br /> Telephone <br /> PO#: f~ dES~~~ <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampfon <br /> Electric Distribution Supervisor <br /> 1. Connect (high pressure sodium) reet li is as p~ ~ttached drawing and bill $/month as per <br /> EWEB J-4 street light schedule.3~~~ ~G~~ `k <br /> 2. This company (will/will not) be interested in this ditch for joint use. <br /> 3. This company (will/will not) be interested in this pole(s) for joint use. <br /> Preliminary billing is as follows: <br /> EWEB to bill for: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation: ~3~~ ~ $ ~7~ <br /> Total: ~ <br /> Agency: r', _ Eugene Water & Electric Bo <br /> - , <br /> Authorized by: gy: <br /> <br /> r <br /> <br />