13-Jan-05 <br /> 14th Avenue Extension Cost Allocation <br /> Construction Cost 276951 <br /> Construction Contingency at 0% 0 <br /> Design Costs to Date 61188 <br /> i <br /> Design Contingency at 10% 0 <br /> City of Eugene Inspection 19712 <br /> <br /> I <br /> 4J Administration 22592 <br /> <br /> I <br /> TOTAL $ 380,443 <br /> 80% of total costs to be paid by County 304,354 <br /> 20% of Total Costs 76,089 <br /> Faith Center Portion (of 20%) at 44% 33,479 <br /> City of Eugene Portion (of 20%) at 56% 42,610 <br /> <br /> i <br /> <br /> i <br /> <br />