City of Eugene <br /> Judkins Point Amend #1 <br /> Page 2 of 3 <br /> northbound freeway off-ramp and north side of 22"d Avenue will be reconstructed. The proposed project <br /> at the Judkins Point South Interchange on Interstate 5 (Pacific Highway M.P. 191.96) is to realign the <br /> Glenwood Drive frontage Road between the southbound ramp terminals and the recently realigned <br /> intersection of Moon Mountain Road with Glenwood Boulevard. The southbound off-ramp will be <br /> widened from one to two lanes and realigned Glenwood Drive will provide two westbound lanes (with right ` <br /> only and through/left operation) and one eastbound lane. Guardrail will be required along the entire south <br /> side of the realigned frontage road. <br /> Under AGREEMENTS, COUNTY AGREES TO, No. 1, page 2, which now reads: <br /> 1. COUNTY, per Board Order No. 02-8-13-3, grants CITY up to $200,000 to be used for Road Fund <br /> eligible expenditures allowable under.the Oregon Constitution, Article IX, Section 3a for the Judkins Point <br /> Interchange Glenwood Boulevard improvements described above. <br /> Shall be amended to read: <br /> 1. COUNTY, per Board Orders No. 02-8-13-3 and No. 04-6-23-9, grants CITY a total up to $420,000 to <br /> be used for Road Fund eligible expenditures allowable under the Oregon Constitution, Article IX, Section <br /> <br /> 3a for the Judkins Point North and Judkins Point South Interchange Glenwood Boulevard improvements <br /> <br /> described above. <br /> This space left intentionally blank <br /> * * * Signature page to follow <br /> _ _ _ _ _ _ <br /> _ _ <br /> <br />