the entrance areas as planned, including bike racks and seating. Prior to ordering the "furnishings" and <br /> actual construction, I would like Holly McRae and myself to go over the final plans with you. Thank you, <br /> Scott. r <br /> Pat <br /> Forwarded by Pat JohnstonfEUFO/OR/BLM/DOI on 10/07/2007 01:38 AM <br /> } <br /> Teresa E <br /> Simpson/SAFO/OR/B <br /> LM/DOI <br /> To <br /> Pat Johnston/EUFO/OR/BLM/DOI@BLM <br /> 4 <br /> Q <br /> 10/05/2007 03:37 <br /> cc <br /> PM <br /> Subject <br /> Re: Fw: Tsanchiifin Trail work and <br /> Task Orders(Document link: Pat <br /> Johnston) <br /> X <br /> S: <br /> Pat, <br /> City of Eugene is an ASAP Recipient, and yes they can drawdown advancements. I recommend they take' <br /> a drawdown for these two soon, so, they are off the UDO report. I am sure you are monitoring or <br /> <br /> working with them to assure that the monies are being, and will be used for the purpose intended. <br /> <br /> teri <br /> 3 <br /> <br />