New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4325 Revenue Folder ODOT
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4325 Revenue Folder ODOT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2009 12:50:09 PM
Creation date
12/30/2008 11:29:44 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
GJN
004325
GL_Project_Number
955052
COE_Contract_Number
2006-00213
GL_Grant
330
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Eugene/State of Oregon, G: artment of Transportation _ <br /> Agreement No. 22,281 <br /> ATTACHMENT NO. 1 to Agreement No. 22,281 <br /> SPECIAL PROVISIONS <br /> 1. Agency or its consultant shall, as a federal-aid participating preliminary engineering <br /> function, conduct the necessary field surveys, environmental studies, traffic <br /> investigations, foundation explorations, and hydraulic studies, identify and obtain all <br /> required permits, acquire necessary right-of-way and/or easements, and perform all <br /> preliminary engineering and design work required to produce final plans, <br /> preliminary/final specifications and cost estimates. <br /> 2. Upon State's award of the construction contr:~ct, Agency, or its consultant, shall be <br /> responsible to perform all construction engineering, field testing of materials, <br /> technical inspection and project manager services for administration of the contract. <br /> 3. In the event that Agency elects to engage the services of a .personal services <br /> consultant to perform any work covered under this Agreement, Agency and <br /> Consultant shall enter into a Personal Services Contract approved by State's <br /> Purchasing and Contracts Unit Manager or designee (Salem). Said contract must <br /> be reviewed and approved by the Purchasing and Contracts Unit Manager or <br /> designee prior to beginning any work. This review includes, but is not limited to the <br /> Request. for Proposal, Statement of Work, advertisement and all contract <br /> documents. This review and approval is required to ensure federal reimbursement. <br /> 4. State may make available Region 2's On-Call PE, Design and Construction <br /> Engineering Services consultant for Local Agency Projects upon written request. If <br /> Agency chooses to use said services, they agree to manage the_work done by the <br /> consultant and make funds available to the State for payment of those services. All <br /> eligible work shall be a federally participating cost and included as part of the total <br /> cost of the Project. <br /> 5: Agency. shall; at its own-expense, maintain and operate the Project upon completion <br /> at a minimum level that is consistent with normal depreciation and/or service demand. <br /> Maintenance responsibilities shall survive any termination of this Agreement. <br /> 6. Agency's Project Manager is Michelle Cahill, City of Eugene, 244 E. Broadway, <br /> Eugene, Oregon, 97401. Telephone number (541) 682-6855. <br /> Key No. 13399 5 <br /> <br /> . . <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.