<br /> - January 13, 2006 City of Eugene #2006-00222 <br /> Misc. Contracts & Agreements <br /> No. 23,076 <br /> LOCAL AGENCY AGREEMENT <br /> SURFACE TRANSPORTATION PROGRAM-URBAN <br /> Chad Drive: Old Coburg Road -North Game Farm Road <br /> THIS- AGREEMENT is made and entered into by and between the STATE OF OREGON, <br /> acting by and through its Department of Transportation, hereinafter referred to as "State," and <br /> the CITY OF EUGENE, acting by andthrough its elected officials, hereinafter referred to as <br /> "Agency." <br /> RECITALS <br /> 1. Chad Drive, Old Coburg Road and North Game Farm Road, are a part of the city street <br /> system under the jurisdiction and control of Agency. <br /> 2. By the authority granted in ORS 190.110, 366.572 and 366.576, State may .enter into <br /> cooperative agreements with counties, cities and units of local governments for the <br /> performance of work on certain types of improvement projects with the allocation of costs <br /> on terms and conditions mutually agreeable to the contracting parties. <br /> NOW THEREFORE, the premises being in general as stated in the foregoing RECITALS, it is <br /> agreed by and between the parties hereto. as follows: <br /> TERMS OF AGREEMENT <br /> 1. Under such authority, State and Agency agree to extend Chad Drive to connect with <br /> North Game Farm Road, hereinafter referred to as "Project." The Project will include two <br /> travel lanes, center turn lane at intersections, curb and gutter, bike lanes and sidewalks <br /> on both .sides of roadway, landscaping, signal and lighting. ,Upon completion of the <br /> Project the maintenance and electrical energy costs for the signal and lighting will be the <br /> responsibility of Agency as described in Special Provisions, Paragraphs 5 and 6 attached <br /> hereto and by this reference made a. part hereof. The location of the Project is <br /> approximately as shown on the sketch map attached hereto, marked "Exhibit A," and by this <br /> reference made a part hereof.. <br /> 2. The Project shall be conducted as a part of the Federal-Aid Surface Transportation <br /> Program (STP) under Title 23, United States Code. The- total Project cost is estimated. at. <br /> $1,260,000, which is subject to change. STP urban funds for this Project shall be limited <br /> to $695,000.. The Project will be financed with STP funds at the maximum allowable <br /> federal participating amount, with Agency providing the match and any non-participating <br /> costs, including all costs in excess of the available federal funds. <br /> Key No. 13404 <br /> <br />