New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3923 Revenue Folder
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3923 Revenue Folder
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2011 4:31:11 PM
Creation date
12/30/2008 11:29:01 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
No
External_View
No
GJN
003923
GL_Project_Number
935034
Identification_Number
Key #13404
COE_Contract_Number
2006-00222
GL_Grant
381
Retention_Destruction_Date
6/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f:~ <br /> <br /> ~.1r;,/~ 3~Z3 <br /> June 14, 2006 <br /> Misc. Contracts & Agreements <br /> No. 23,076 <br /> City of Eugene Contract 2006-00222 <br /> LOCAL AGENCY AGREEMENT <br /> SURFACE TRANSPORTATION PROGRAM -URBAN <br /> Chad Drive: Old Coburg Road -North Game Farm Road <br /> Amendment No. 1 <br /> The State of Oregon, acting by and .through its Department of Transportation, <br /> hereinafter referred to as State, and the CITY OF EUGENE, acting by and through its <br /> elected officials hereinafter referred to as "Agency," entered into an Agreement on <br /> February 14, 2006. Said Agreement covers the extension of Chad Drive to connect with <br /> North Game Farm Road. <br /> It has now been determined by State and Agency that the Agreement referenced above, <br /> although remaining in full force and effect, shall be amended to .include right of way <br /> services. <br /> Para ra h 1 <br /> of S ecial Provision <br /> g p p s, Page 5, which reads. <br /> 1. Agency, or its consultant shall, as a federal-aid participating preliminary <br /> engineering function, conduct the necessary field surveys, environmental studies, <br /> traffic investigations, foundation explorations, and hydraulic studies, identify and <br /> obtain all required permits, assist State with acquisition of necessary right of way <br /> ,and/or easements, and perform all preliminary engineering and design work <br /> required to produce final plans, preliminary/final specifications and cost <br /> estimates. <br /> Shal( be deleted in its entirety and amended to read: <br /> 1. Agency,. or .its consultant shall, as a federal-aid participating preliminary <br /> engineering function, conduct the necessary field surveys, environmental studies, <br /> traffic investigations, foundation explorations, and hydraulic studies,. identify and <br /> obtain all required permits, acquire the necessary right of way and/or easements <br /> as shown in the attached Exhibit B, by reference .made. a part hereof, and <br /> perform all preliminary engineering and design work required to produce final <br /> plans, preliminary/final specifications and cost estimates. <br /> This amendment may be executed in several .counterparts (facsimile or otherwise) all of <br /> which when taken together shall constitute one agreement binding on all parties, <br /> notwithstanding that all parties are not signatories to the same counterpart. Each copy <br /> of-this amendment so executed shall constitute an original. <br /> Except as expressly amended above, all other terms and conditions of the Agreernent <br /> are still in full force and effect. The Parties certify that the representations, warranties <br /> and certifications contained in the original Agreement are true and correct as of the <br /> ra„ , } <br /> I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.