New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
BLM Master Revenue Folder
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
BLM Master Revenue Folder
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2009 12:40:26 PM
Creation date
12/30/2008 10:59:50 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
Identification_Number
BLM Master Agreement
GL_Grant
310
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> U 21/L.7/ VJ lIIU 1G.1! i'I1a 1 JY1 VOJ V (V / P..UV DLlll ii~VVVl\GiLLGl\1-lAlfl 'C.1"""+ <br /> t ~ <br /> STATEMENT OF WORK <br /> ~azardons Faels Reduction <br /> 1.0 DESCI2IPT10N Op' VVORI~ <br /> Tl2e City of Eugene will supervise 1~orthwest Xouth Carps and Lane Metro <br /> Looking Glass youth crews to complete the following projects for the BLM, <br /> Eugene District Office, West Eugene Wetlands Project: Weed removal, seed <br /> collectiorx, ladder fuels ren~.oval, identifyiu~g and mapping potential hazardous <br /> fuels/weeds, protection, fencing, coozdizi,ate with BLM fire staff and assist with <br /> prescribing bum and habitat i~nprovenier~t projects at several West Eugcnc <br /> Wetla~~d sites tl~.at occuz on BL]V.T laud_ The City will also oversee and coordinate <br /> all mowing activities to reduce hazardous fuels on wetland and uplaad sites within <br /> the WEW. <br /> 1.1 ~CCESS/LOCATION <br /> ,Access to sites isviaall-weather roads. ThE sites,l-Tansen and Chermecky, aTe <br /> located in the West Eugene Wetlands of the Euger,%e BLM District at the <br /> Oakwood Land Site. Other sites will be identified at a later date. They are <br /> located on varied terrain from steep to gentle slopes with various distaaces, so that <br /> the tools will need to be packed in. from the roads. Work areas will be at <br /> G~overna~cient-approved sites. <br /> 1.2 wo~)EIO><JRS <br /> Work hauls, start/stop times for noise-making activitties (power equipment may <br /> be operated) will be between. two Hours after sunrise until (1) hour before <br /> sunset_ <br /> 1.3 SITE SECURITY . <br /> City personnel fu1fi11ing the requirements of this order will be based out the BLM <br /> facility at 751 South Danebo and. using BLM equipment. City personnel will be <br /> responsible for seeuriz?g all tools on site in storabc space provided. Staff will a.Iso <br /> be responsible for locking buildings if they are the last person leaving the office at <br /> the end of the work day. <br /> Northwest Youth Corps will be supplying their own equipment, az~d may leave <br /> their equipzn.ent at the work site. However, the C~overnn~.ent wilt not be <br /> responsible for fiheir equipment if it should become lost, stolen, or damaged. <br /> BLM operator will be responsible for secuzin.g BLM mowing ecluipxnent. <br /> _ _ <br /> _ _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.