New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3890 Revenue Folder
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3890 Revenue Folder
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2009 3:56:00 PM
Creation date
12/30/2008 10:10:49 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
GJN
003890
GL_Project_Number
905116
COE_Contract_Number
2005-00202
GL_Grant
167
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A ~ <br /> Y <br /> Project Team members also may consult with the FEMA Regional Project Officer to request support in <br /> the areas of selection of data sources, digital data accuracy standards, assessment of vertical data <br /> accuracy, data collection methods or subcontractors, and GIS-based engineering and modeling training. <br /> Section 9-Contractors <br /> The City of Eugene intends to use the services of PWR as a contractor for the Flood Map Project <br /> documented in this MAS. The City of Eugene shall ensure that the procurement for all contractors used <br /> for this Flood Map Project complies with the requirements of 44 CFR 13.36. <br /> j Part 13 may be downloaded in PDF or text format from the U.S. Government Printing Office Web site at <br /> http://www.access.gpo.~;ov/nara/cfr/waisidx=02/44cfr13_02 html. <br /> Section 10-Reporting <br /> Because funding has been provided to the City of Eugene by FEMA for the Flood Map Project <br /> documented in this MAS, fmancial reporting requirements for the City of Eugene will be in accordance <br /> i with Cooperative Agreement Articles V and VI. <br /> The City of Eugene and PWR will meet with the NSP and/or FEMA as necessary to review the progress <br /> of the project. <br /> The City of Eugene and PWR will report to the NSP monthly. This report will use a spreadsheet template <br /> to be filled out each month. It may include dollars spent, hours spent, and percent complete of each major <br /> Flood Map Project activity (field survey, terrain, hydrology, etc.). Specific reporting requirements will be <br /> finalized as a part of the PWR kick-off meeting with the City. <br /> Section 11-Points of Contact <br /> The points of contact for this Flood Map Project are David Carlton, P.E., the FEMA Regional Project <br /> Officer; Terry Colvin, the Project Manager for the City of Eugene; or subsequent personnel of <br /> comparable experience who are appointed to fulfill these responsibilities. When necessary, the assistance <br /> of the NSP should be requested through the FEMA Project Officer, Kelly Bronowicz. <br /> <br /> i <br /> In addition, the NSP is required to coordinate project issues with the party that actually created the MAS <br /> deliverable or portions of the MAS deliverable product and will document all such coordination activities <br /> with the CTP and FEMA. <br /> Section 12-Project Coordination <br /> Throughout the project, all members of the Project Team will coordinate, as necessary, to ensure the <br /> products meet the technical and format specifications required and contain accurate, up-to-date <br /> information. Coordination activities shall include: <br /> • Meetings, teleconferences, and videoconfernces with FEMA and other Project Team members as <br /> required; <br /> Mapping Activity Statement No.1 33 <br /> City of Eugene, OR <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.