<br /> ' July 26, 2004 City of Eugene Contra~a#: 2005-00204 <br /> Misc. Contracts & Agreements <br /> No. 21,833 <br /> COOPERATIVE IMPROVEMENT AGREEMENT <br /> Garden Way Preventative Maintenance <br /> City of Eugene <br /> THIS AGREEMENT is made and entered into by and between THE STATE OF <br /> OREGON, acting by and through its Department of Transportation, hereinafter referred <br /> to as "ODOT' ; and THE CITY OF EUGENE, acting by and through its designated <br /> officials, hereinafter referred to as "City". <br /> RECITALS <br /> 1. OR 99W, also known as Pacific Highway West, is a part of the state highway <br /> system under the jurisdiction and control of the Oregon Transportation Commission. <br /> Garden Way, Coburg Road and Country Club Road are a part of the city street <br /> system under the jurisdiction and control of City. <br /> 2. By the authority granted in ORS 190.110, 366.572 and 366.576, ODOT may enter <br /> into cooperative agreements with the counties, cities, and units of local governments <br /> for the performance of work on certain types of improvement projects with the <br /> allocation of costs on terms and conditions mutually agreeable to the contracting <br /> parties. <br /> NOW THEREFORE, the premises being in general as stated in the foregoing recitals, it <br /> is agreed by and between the parties hereto as follows: <br /> TERMS OF AGREEMENT: <br /> 1. For the purpose of providing acceptable traffic patterns on City and ODOT roadways <br /> during the construction of ODOT's I-105 Willamette River -Pacific Highway project, <br /> hereinafter referred to as "Roadway Project", ODOT and City -agree to improve <br /> Garden Way, on which the City currently is conducting a roadway improvement <br /> project, and use this" portion of roadway for the routing of contractor truck traffic <br /> during the construction of the Roadway Project, hereinafter referred to as <br /> "Contractor ..Detour Route", as shown in Exhibit A attached hereto and by this <br /> reference made a part hereof. The improvements to the Contractor Detour Route <br /> include reinforced PCC driveways and added asphalt concrete depth to Garden <br /> Way. <br /> 2. ODOT shall use the funds available for the Roadway Project to contribute to the <br /> Contractor Detour Route under this Agreement. ODOT shall contribute a maximum <br /> amount of $~~2~;000'fortiards the City's current roadway improvement project. <br /> Key no. 10349 <br /> <br />