New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY04 SB1
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2008
>
FY04 SB1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2010 12:54:56 PM
Creation date
12/29/2008 3:34:39 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2004
PW_Division
Administration
Identification_Number
SB1FY04
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> The City of Eugene Will: <br /> ii 1. Provide seeds required for reseeding disturbed and restored lands in the 1135 Project Area in <br /> accordance with the approved project planting plan. Seeds required for the project have been <br /> previously collected for the project under task order 02-1 and are in storage at the Bureau of Land <br /> Management. There is no additional cost for seed collection and treatment. <br /> 2. Provide labor to assist in planting of native seeds collected under task 2 above, including the <br /> following achvihes <br /> a. Tilling and seedbed preparation <br /> i b. Drilling and broadcasting seeds <br /> c. Prescribed burns and/or thermal weed control <br /> Most of the. seeding will occur in the. "Boot". unit of the project <br /> Estimated Cost:. $16,000 <br /> j <br /> 3. Provide labor for on-site botanical assistance including invasive species removal contract <br /> oversight, summer 2003 remedial activity coordination, and natural resource coordination with <br /> <br /> J recreational feature improvements. (25 Weeks at $750 per week, March 17 -September 12). <br /> I <br /> Estimated Cost: $18,750 <br /> Reimbursement of Services: Total funding for all tasks listed in this Funding not to exceed <br /> $34,750 is obligated by the Corps of Engineers under purchase Requisition No. <br /> W66QKZ01803692 (Line Item 6) for reimbursement of the City's contract, labor, supplies and <br /> equipment costs incurred during performance of all or portions of the work. <br /> . C,._. -U 3 <br /> AMES D. VAN NEST Date <br /> rants Officer <br /> U.S. Army Corps of Engineers <br /> Portland District <br /> KUR COREY Date <br /> Director, Departure of Public Works <br /> City of Eugene, Oregon <br /> 2 <br /> _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.