1.4 Fire Precautions <br /> 1.4.1 All state fire laws will be followed. <br /> Specific requirements for fire equipment may vary by local fire district. The <br /> CITY is required to check with local fire districts and furnish any. equipment <br /> - ~ ~ required by hose districts. - ~ . . <br /> 2.0 DEFINITIONS <br /> None. <br /> 3.0 ~ COOPERATOR <br /> FURNISHED ITEMS <br /> . All materials, supplies, and equipment needed to complete this work will be <br /> provided by the Cooperator. <br /> i <br /> 4.0 GOVERNMENT-FURNISHED ITEMS <br /> None. <br /> S.0 SPECIFIC TASKS <br /> The purpose of this task order is to provide funding for in-stream, riparian, <br /> wetland, and upland habitat types along Amazon Creek near Dragonfly Bend. The <br /> - specific tasks include: <br /> ~A. Engineering and design. This will be conducted by City staff and consultants <br /> <br /> i <br /> hired by the CITY. This task will include costs such as pre-construction . <br /> surveys, as well as production of construction documents and bid <br /> specifications. <br /> . B. ,Contract and project management, including advertisement, administration, <br /> - and bid preparation ofproject. This work will be performed by CITY staff. <br /> . C. The clearing of existing, mostly non-native, vegetation that is growing along <br /> the creek banks and in the riparian zone. This work will be performed by a <br /> - contractor hired by the City using a competitive bid process, or by CITY staff. <br /> .The work will be inspected on-site by City staff. <br /> D. Smoothing the grade of the levee banks along Amazon Creek. This work will <br /> ' be performed by a contractor hired by the City using a competitive bid <br /> process. The work will be inspected on-site by City staff. <br /> E. Widening the creek channel in several locations. This work will be performed <br /> by a contractor hired by the City using a competitive bid process. This work <br /> _ _ <br /> . <br /> _ _ <br /> <br />