New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY04 SB1
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2008
>
FY04 SB1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2010 12:54:56 PM
Creation date
12/29/2008 3:34:39 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2004
PW_Division
Administration
Identification_Number
SB1FY04
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
professional interpretation of subsoil conditions at the building site and shall perform <br /> such additional work as authorized by the Government. The extent of exploration <br /> undertaken shall be consistent whet the scope of the Project as indicated by the <br /> information given above and by any drawings attached hereto. <br /> 5.1.2 Drilling and Sampling Methods <br /> i <br /> (1) Unless otherwise stipulated, drilling and sampling will be performed in accordance <br /> with current applicable ASTM (American Society of Testing and Materials) standards <br /> and other standards, including, but not limited to ASTM standards D1586, D1587, and <br /> D2113. <br /> (2) The samples shall be preserved and field logs prepared either by a Geotechnical <br /> Engineer or by an experienced soils technician acting under the supervision of a <br /> Geotechnical Engineer. <br /> <br /> i <br /> 5.1.3 Protection of Pro e~rty <br /> The Geotechnical Engineer shall contact the Government and all utility companies for <br /> information regarding buried utilities and structures, shall take. all reasonable precautions <br /> to prevent damage to property both visible and concealed, and shall reasonably restore <br /> the site to the condition existing prior to the Geotechnical Engineer's entry. Such <br /> restoration shall include, but not be limited to, back filling of borings, patching of slab <br /> and pavements, and repair of lawns and plantings. Each boring should be temporarily <br /> plugged, pending additional groundwater readings. At the completion of the groundwater <br /> readings, the borings shall be permanently plugged; including patching of slab and <br /> pavements. <br /> 5.2 Reports <br /> 5.2.1 Format <br /> All segments of the reports covering the investigations and analyses shall be made on <br /> white paper, 8 %2 X 11 inches, suitable for photocopying, and shall be bound in booklet <br /> form. <br /> 5.2.2 Field and Laborator~Reports <br /> (1) All data required to be recorded according to the ASTM standards or other standard <br /> test methods employed shall be obtained, recorded in the field and referenced to boring <br /> numbers; soil shall be classified in the field logs in accordance with applicable ASTM <br /> standards and other standards, including, but not limited to, ASTM standard D2488, but <br /> the classification for final logs shall be based on field information, plus results of tests, <br /> plus further inspection of samples in the laboratory by the Geotechnical Engineer <br /> preparing the reports. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.