additional insured. <br /> "All Risk" Property Insurance covering all of the Contractor's equipment used to perform <br /> the Work. A waiver of subrogation against Amtrak is also to be included. <br /> Builder's Risk Insurance providing All Risk coverage on a Completed Value basis, <br /> including labor and materials (in place, on site, in storage off-site or in transit). <br /> Contractor (and subcontractors) and Amtrak are to be named as Loss Payee, with respect <br /> to their interests in the covered property. <br /> Railroad Protective Liability Insurance (current ISO Form) with Amtrak as the named <br /> insured on the policy. Limits of liability shall be Two Million Dollars ($2,000,000) per <br /> occurrence, combined single limit and Six Million Dollars ($6,000,000) annual <br /> aggregate. Policy Endorsement CG 28 31 -Pollution Exclusion Amendment is also to be <br /> included. <br /> A Certificate of Insurance evidencing the above coverages and the original Railroad <br /> Protective Policy is required prior to the start of any Work. The City will cause its contractor <br /> and any subcontractors to include Amtrak as an additional insured in any insurance policies <br /> required by the City in its contracts for the Work. <br /> 8. In connection with the renovation of the Station, the City shall obtain local site and building <br /> plan approvals and final building inspections. Upon completion of renovation, the City shall <br /> obtain a certification from the architect of the renovation project that the Work was <br /> constructed inconformity with all the Construction Documents. Upon receipt of such <br /> certification, the City warrants that the Station shall be in full compliance with all applicable <br /> laws, ordinances and regulations, including without limitation all applicable building codes, <br /> zoning, environmental and requirements of the American with Disabilities Act of 1990, as <br /> amended (the "ADA"). Notwithstanding the foregoing, the City shall remain liable for the <br /> cost or repair or corrections of items of Work to the Station subsequently determined not to <br /> have been constructed in accordance with applicable laws, ordinances, regulations zoning or <br /> buil cod r <br /> ding a equirements in effect at the time of permit issuance. The City also shall <br /> furnish to Amtrak, at the Ci 's sole cost and a nse a co of the azchitect's certifica <br /> tY hon <br /> ~ PY <br /> and as built drawings and electronic files auto cad format of the Statio within seven 7 <br /> ( ) <br /> days of substantial completion of the Work. ( ) <br /> <br /> 9. Amtrak will contnbute to the City up to the full amount of Amtrak's Contribution for the <br /> design and renovation of the Station as follows: <br /> A) An amount not to exceed Two Hundred Fifty Thousand Dollars ($250,000) towazd the <br /> design plans for the renovation of the Station. After Amtrak's receipt, review and <br /> approval of the design plans for the Station, the City will submit a detailed invoice for <br /> the design costs. Amtrak will pay to the City any undisputed amount up to the <br /> maximum $250,000 within thirty (30) days after Amtrak's receipt of the City's <br /> invoice. If Amtrak disputes any portion of the invoice, Amtrak will promptly notify <br /> the City of the amount in dispute and the reason therefore. Amtrak and the City shall <br /> negotiate in good faith to resolve any such dispute. If the parties are unable to resolve <br /> the dispute after sixty (60) days, Amtrak shall make the final decision. <br /> B) An amount not to exceed the balance remaining of Amtrak's Contribution (after any <br /> payment by Amtrak pursuant to Section 9A above) toward the construction,costs for <br /> the Work. Upon Substantial Completion, the City will submit an invoice for <br /> construction costs of the Work. Amtrak will pay to the City any undisputed amount <br /> up to the maximum balance remaining from Amtrak's Contribution within thinly (30) <br /> days after receipt of the City's invoice. If Amtrak disputes any portion of the invoice, <br /> Amtrak will promptly notify the City of the amount in dispute and the reason <br /> <br />