Notification of Commencement and <br /> Public Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 7!8!2008 2008-26 <br /> PROJECT NAME JOB NO. <br /> 2008 Rehabilitation South Ramp 4530 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Knife River 3-41-0018-40 <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Daniel Durazo 541-682-2680 06/06/08 <br /> FIRST NOTIFICATION <br /> 07l08l081S THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 09118108 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST 8E SUBMITTED BY: <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 9118+08 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> BV THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITYS NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GRE ER THAN THE R UIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENT-5 N1ADE NECESSARY BY D TS IN W <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHI H ONE-Y A NTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE PAI . <br /> Inspecor Signature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBt1TIONfOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor ~ Engineer Ovmer Construction Manager File Damon .byner,PWM <br /> ~l`1 ~W <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety Pw AdminisVation PIC Engineering PVJE As Construct Monitor MADD Supervisor Inspector <br /> <br /> 0:1PROJECTSIPROJ-0145301CorrespondencelConlractors14530-20080923 THIRD Notifcation.doc APRIL 2004 M g <br /> <br />