New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4522 Warranty 11.10.08
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4522 Warranty 11.10.08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 9:23:15 AM
Creation date
12/22/2008 1:17:21 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004522
GL_Project_Number
374522
COE_Contract_Number
2008-00518
Retention_Destruction_Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and Puttlloworks <br /> Completion Dates for Contract Projects Engirreering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 11/13/2008 2008-518 <br /> PROJECT NAME JOB NO. <br /> Rosewood Meadows 4522 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Kipcc Inc., 90465 WoodnAf St., Eugene, OR 97402 N/A <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Kad Kreutzer 54182-8466 WA _ _ . <br /> FIRST NOTIFICATION : / <br /> i <br /> 6/16108IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. ~ 1 ~"ecla tgnalure <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> WA - WA - 9118/08 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MU3T BE SUBMTTfED BY: <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> ns SlgnaWre <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 11/10/0815 THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTNE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER5 RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE - <br /> WARRANTIESREMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WOR TH <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN 7HE O ~Y <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR <br /> nspe r ig re <br /> For Privately Engineered Projects Only <br /> Engineer: Branch Engineering, Inc. <br /> Address: 310 Fifth Street <br /> Spdngfield, Oregon 97477 <br /> Owner: Chris Houser <br /> Address: P.O.BOx 24906 <br /> Eugene, Oregon 97402 <br /> DISTRIBl1TION FOR FIRST. SECOND, AND THIRD NOTIFICATION: <br /> Contractor ~ Engirreer Owner Construction Manager File Daman Joyner, PWM <br /> iss T.W <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As COn1etNC1 Monitor MADD Supervisor Inspector <br /> <br /> Q:IPROJECTSIPROJ-2145221CorrespondencelContraclorskl522-20080916Third NotificationKBK.tloc APRIL 2004 mQ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.