New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4464 Delta Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4464 Delta Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 9:58:52 AM
Creation date
12/22/2008 9:28:15 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004464
GL_Project_Number
995432
COE_Contract_Number
2007-00024
Retention_Destruction_Date
7/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Notification of Commencement and Pualicworks <br /> <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 7/10!2007 2007-024 <br /> PROJECT NAME JOB NO. <br /> Air Cargo Ramp Expansion 4464 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Delta ConsVuction 3-41-002&39&40 <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> DanielDurazo 541-682-2680 6!26!07 <br /> FIRST NOTIFICATION <br /> 07/10/200715 THE DATE ON WHICH THE CANTRACT WORK BEGAN. Irupector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 0 11/10/07 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 12/01107 <br /> (SEBSUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 12/OtY100715 THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'SRECEIPT OF ALL CERTIFICATiONS,BlLLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT FOR THE DURATION OF THE EX!'RESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS I RK THAT BE E EVIDENT <br /> WffHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YE RAN 0 WILL BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Inspector Signs e <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner ConsWCtion Manager File Damon Joyner, PWM <br /> n~'~ <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspects <br /> D:IPROJECTS\P ROJ-4\4464\ConespondencelContractors14464-2007081thirdno[eDD.doc APRIL 200a (Y\g <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.