Notification of Commencement and Public Works <br /> <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 12/10!08 WA <br /> PROJECT NAME JOB NO. <br /> EmX Franklin Section (This Is far the Franklin and 1101 Ave Intersectlon only) 4332 - A Franklin111~" Intersection) <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Wildish Construction N/A <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Kris Olson 541 682-5249 NIA <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 11!3108 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS,BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THEDNE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3, #4 8 #5, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE . <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF2 REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE W IT IN THEARRANTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE-YEAR FROM DATE OF ACCEPTANCE OF AIR. <br /> Inspector Signature <br /> For Privately Engineered Projects Only <br /> Engineer: Parsons Brinckerhoff Quade 8 Douglas Inc. <br /> Address: 400 SW 6r" Ave, Suite 802 <br /> Portland OR 97204 <br /> Owner. Lane Transit DisUict <br /> Address: 3500 E. 1701 Ave <br /> Eugene OR 97403 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Coneactor Engineer Owner ConsWdion Manager Flle Ginger Pereles,PWM <br /> j31 ~t? <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Atlminisaalion PIC Engineering PWE As Constmct Monitor MADD Supervisor Inspector <br /> APRIL 2004 <br /> o. <br /> i <br /> Q:IPROJECTSIP,ROJ-214332 MX-LTD\Correspondence\ContractorsW332-20081210 3rd NoteFranklinandlllh.doc <br /> <br />