Public Works <br /> Engineering <br /> City of Eugene <br /> 244 East Broadway <br /> Eugene, Oregon 97401 <br /> I (541)682-5560 <br /> (541) 682-8410 FAX <br /> Memorandum <br /> i <br /> Date: October 30, 2007 <br /> To: Paul Klope <br /> i <br /> From: Matt Rodrigues <br /> <br /> j Subject: Revised Budget for 4479-PPP Roosevelt Blvd. From Chambers to Beltline <br /> Paul, <br /> I am submitting a revised budget for GJN 4479-PPP Roosevelt Blvd. to increase the available <br /> bud et to $100 000. This increase should cover relimi <br /> g p nary design for the project. This project <br /> has a total project budget of $2,734,000, 50% of which is STP-U funding which has yet to be <br /> authorized. My plan is to move all STP-U fimding into the construction phase. <br /> _ _ <br /> _ <br /> <br />