OREGON DEPARTMENT OF TRANSPORTATION <br /> LOCAL ROAD AND STREET QUESTIONNAIRE <br /> FOR FISCAL YEAR ENDING JUNE 30, 9997 <br /> IV. EXPENDITURES ON CLASSIFIED AND LOCAL ROADS AND STREETS <br /> Minor Arterial on the National Highway System 2.10 Miles <br /> <br /> I ~ ITEM AMOUNT <br /> <br /> i <br /> <br /> [ ~ a. CAPITAL OUTLAY <br /> Construction, Expansion and Preservation <br /> a. Right of way $57,372 <br /> b. Construction Engineering <br /> 1) Capital Improvement Plan Development... <br /> 2) Preliminary Engineering 63.,621 <br /> 3) Construction Engineering 140,050 <br /> c. Construction and Expansion <br /> 1) Road <br /> 2) Bridge 2x246,145 <br /> d. .Repair and Preservation <br /> <br /> I~ 1) Road <br /> 2) Bridge <br /> TOTAL CAPITAL OUTLAY ~?._,.507,1A8 <br /> Line item totals on these part IV pages must equal that line item total on part II, <br /> disbursements for road and street purposes, for Capital Outlay only. <br /> RETURN T0: <br /> <br />