New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4572 2009-00012
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4572 2009-00012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2009 3:54:46 PM
Creation date
11/26/2008 3:12:18 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004572
GL_Project_Number
985682
COE_Contract_Number
2009-00012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
also contain an endorsement naming City as an additional insured, in a farm satisfactory to City, <br />and expressly providing that the interest of City shall not be affected by Contractor`s breach of <br />policy provisions. <br />g.3. Workers' Compensation Insurance. All employers, including the Contractor and its <br />Subcontractors, if any, that employ subject workers who are performing Work or providing labor <br />or Materials under the Contract in the state of Oregon shall.. complywith ORS 656.011 and <br />provide the required Workers' Compensation coverage, unless such employers are exempt <br />under ORS 656.126. The Contractor shall ensure that each of its Subcontractors complies with <br />these requirements. Contractor shall provide City with such further assurances as City may <br />require from time to time that Contractor is incompliance with these vllorkers' Compensation <br />coverage requirements and the Workers' Compensation law. The Contractor shall ensure that its <br />insurance carrier files a guaranty contract with the Oregon Workers' Compensation Division <br />before performing any Work. <br />10. Performance and Payment Bonds. Prior to the commencement of the Work, Contractor shall <br />provide good and sufficient performance and payment bonds approved by City, each in an amount <br />equal to the 100°/0 of the Contract Sum, for the faithful performance of the Work in all respects and <br />indemnifying City for any claims or liens for labor, work, equipment or material provided by others in <br />the performance ofthe Work. The amount of the performance and payment bonds shall be increased <br />whenever the Contract Sum is increased for any reason. <br />11. Termination and Suspension. City mayterminate this contract or suspend the Work at any time as <br />provided in the Specifications. <br />12. Preference for Goods and Services. <br />12.1. Contractor shall use recyclable products to the maximum extent economically feasible in the <br />performance of the contract work set forth in this Document. Recycled products include all <br />materials, goods and supplies, not less than 50 percent of the total weight ofiwhich consists of <br />secondary and post consumer waste with not less than 10 percent of its total weight consisting <br />of post consumer waste, as well as any product that could have been disposed of as a solid <br />waste, having completed its life cycle as a consumer item, but otherwise refurbished for reuse <br />without substantial alteration of the product's form. <br />12.2. In performance of the Work, Contractor shall prefer materials that have been manufactured or <br />produced in the state of Oregon, if price, fitness, availability and quality are otherwise equal. <br />13. Default and willful Violation. Without limiting the City's right tv debar the Contractor for up to three <br />years, if the Contractor willfully violates any of the provisions of Sections 4.615 to 4.650 of the Eugene <br />Code, 1911, ar any of the provisions of State law governing public contracts, or if Contractor knowingly <br />files false affidavits of compliance required under the Contract, Contractor shall waive for a period of <br />one year any right to bid upon any public improvement project let by City. If Contractor or any of <br />Contractor's Subcontractors violates any such provisions or files any such false affidavits of <br />compliance, or in the event Contractor otherwise fails to perform any of its obligations under this <br />contract, time and quality of performance being of the essence, City may, at its option, terminate this <br />contract upon written notice to Contractor. In the event of a termination of this contractor a <br />subcontract under these provisions, Contractor or the Subcontractor, if applicable, shall forfeit all <br />rights under this contract or the subcontract, as the case maybe. The City's claim for damages under <br />paragraph 15 and any other relief available. to City resulting from the Contractor's breach shall survive <br />a termination of the Contract. <br />14. Liquidated Damages, In the event the Work is not completed within the contract time as specified in <br />the Contract Documents, Contractor will pay to City liquidated damages as specified in the <br />Specifications. The parties believe that due to the costs of bringing an action and the difficulty of <br />establishing the exact amount of damages City will incur, it would be inconvenient and infeasible for <br />Public Improvement Contract far Use with Qregon Standard Specifications -Page 3 <br />~Revis~d February 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.