ear. R~PRlNT~D FRAM THE FUR~IS LIBRR~iY.r.r <br />~. For ail sums which the insured becorn~ legally <br />obligated to pay as damages caused by <br />"occurrences" under c~}vERA~E ~ ~SECTI~N <br />l~, and for all rr~edical expenses ~au~ed by ~C~i- <br />der~ts under C~VERA~E C ~SE~TI~N 1~, which <br />cannot be attributed only to ongoing operations <br />at a single designated construction project shown <br />in the schedule above; <br />~. Any payments made under ~~VE~AGE A <br />for damages or under CC~IIERA~E ~ for <br />medicaa expenses shall reduce the amount <br />available under the General Aggregate Limit <br />or tl~e products-Completed ~plrrations Ag- <br />gregate Limit, whichever is applicable; and <br />~. Such payments shali not reduce any Qesig- <br />nated Construction Project general Aggre- <br />gate Limit, <br />G. ~ whlan coverage for liability arising out of the <br />~products•corr~pleted operations haza~#" is pro- <br />vided, s-ny payments for damages because of <br />~b~dily injury" or ~prapery damagen included in <br />the "products-completed operations hazard" will <br />reduce the Products-~omplet~i operations Ag- <br />gregate Limit, and not reduce the General Ag- <br />gregate Limit nor the Designated construction <br />Project General Aggregate Limit. <br />D. If the applicable designated construction project <br />has been abarrdaned, delayed, or abandoned and <br />then restarted, er if the authorised contracting <br />parties dewlate from plans, blueprints, designs, <br />specifications or timetables, the project will still <br />be deemed to be the lama construction project. <br />E. The provisions of Limits Cf Insurance {SECTION <br />illy not otherwise modified by this endorsement <br />shall continue to apply as stipulated. <br />Page ~ a ~ <br />