New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4572 2009-00012
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4572 2009-00012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2009 3:54:46 PM
Creation date
11/26/2008 3:12:18 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004572
GL_Project_Number
985682
COE_Contract_Number
2009-00012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works <br />Engineering <br />City of Eugene <br />244 East Broadway <br />Eugene, Oregon 97401 <br />(541)682-5560 <br />(541) 682-8410 FAX <br />Memor <br />andum <br />Date: November 20, 2008 <br />To: File <br />From: Scott Milovich, LA, Project Manager <br />Subject; Initiation History of Delta Pands Riparian Planting 2008-2009 <br />Job #4572} Contract #2009-12} <br />This contract was initiated in Pw Parks and Open Space working with Purchasing and re uestin <br />q g <br />quotes for a specific work at a maximum value. All required purchasing documents such as drug <br />testing, non collusion etc were included in the request for quotes. <br />After quotes were received additional funding became available and it was decided that Pw <br />Engineering would manage the prof ect. Negotiations commenced and a contractor was selected with <br />reduced unit. prices and a greater scope of work. <br />The current scope and unit prices are within the current bud et were based an cam etitive races <br />g ~ p p s to <br />select a contractor and were value-engineered to meet purchasing requirements balanced with sco e <br />p <br />and budget. We recommend proceeding with a standard City of Eugene Contract for construction. <br />All documents involved in the process are attached to the contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.