20D9 Rehab North Ramp at South Kilo <br />10/2012008 <br />Estimate Pre Design <br />8" HMA on 14" CTB on 6" rock <br />40DDD sf <br /> Unit <br />mob-1D°/o Is <br />SafetylSecurity Is <br />Erosion Control Is <br />Unclassified Excav cy <br />AC 8" to <br />Subbase Course, 6" sy <br />CTB sy <br />Geotextile Fabric sy <br />Striping sf <br />contingency <br />testing <br />AiportAdmin <br />PrintinglAdvertising <br />Warranty <br />engineering <br />10°/0 <br />16°/0 <br /> Unit <br />Qty Cost Total <br />1 $ 42,158 $ . 42,158 <br />1 $ 50,000 $ ~ 50,000 <br />1 $ 1,oao $ 1,oao <br />3451 $ 16 $ 55, 309 <br />1500 $ 80 $ 120, 000 <br />4444 $ 10 $ 44, 444 <br />4444 $ 22 $ 97, 778 <br />4444 $ 2 $ 8,889 <br />400 $ 5 $ 2, 000 <br /> $ 421,518 <br /> 42,157.75 <br /> $ 5,DDD <br /> $ 3, 000 <br /> $ 1,000 <br /> $ Sao <br /> 61,42.40 <br /> TOTAL: $ 544,688 <br />