~. „ <br />,• <br />STREET LIGHT CONSTRUCTiGN NOTICE <br />r <br />t <br />AGENCY: City of Eugene EWER DRAWING #: <br />EWEB MAP #, 22G <br />DATE: November ~ 9, 2008 <br />City ofEugene-PWM ~Maintenance~ ^ <br />Gity of Eugene-PWE Capital and PEPI} <br />Please provide power and connect 8 watt HPS street lights <br />These plans are outlined below and shown on the attached drawing: <br />EWEB CONSTRUCTION PLANS <br />PRUJECT NAME: SPRING KNGLL 2 Pro`ect # 400? <br />Developer"s Name: Eugene Water & Electric Board <br />Telephone #: <br />COE Rep's Name: Randal Dale Prepared By: D. Kepley <br />Telephone #: 682-4961 Telephone #: 541-682-5349 <br />Eugene Water & Electric Board <br />Attention: Debbie Crompton <br />Electric Distribution Supervisor <br />REPLY <br />Multiply # of lights by the monthly rate <br />8 (70 watt HPS) x $3.45 = $27.60 <br />1, Connect 8 high pressure sodium street lights as per attached drawing and bill $21.601month as per <br />EWEB J-4 street light schedule. <br />Preliminary bluing is as fiollows: <br />EWEB to bill City of Eugene Debbie Clark} for the following work: <br />Ditch: $ <br />Duct: $ <br />Other: ~ $ <br />Transfer: $ <br />New Installation or connectldisconnect in same box: $ 325.4U <br />5 connections - 5 x 5l + 40 = 325 <br />Total: $ 325.a~ <br />Agency: ~- ~ Euge Wate & Electric Board <br />Authorized by: By; <br />~;-~,.s~ D ~ ~-25332. <br />Q:\FORMS\PROJECTIEWEB\StreetLightConstNtc.doc ~~~ 2 4 208 <br />,~ <br />~~ <br />.~ .. <br />y.:~. <br />s <br />t. <br />