New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2006 COE PROS Project-Priority Plan
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
2006 COE PROS Project-Priority Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 10:21:55 AM
Creation date
2/15/2022 10:20:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
Table 1: Proposed Projects & Priorities for Parks, Open Space <br />and Recreation Facilities <br />Bethel Danebo <br />Acquire a neighborhood park site to serve this area (B3) <br />r <br />0 <br />a <br />1 <br />Acquire a neighborhood park site to serve this area (B5) <br />1 <br />Acquire a neighborhood park site to serve this area (B1) <br />1 <br />Develop Royal/Danebo neighborhood park site to serve (B4) <br />1 <br />Acquire natural area within Royal Mixed Use area <br />3 <br />Develop neighborhood park site (B5) <br />3 <br />Acquire land in Bethel for urban plaza to be developed in partnership with transit <br />3 <br />Acquire linear park along Roosevelt drainage channel <br />3 <br />Develop neighborhood park site (B1) <br />4 <br />Acquire portion of Union Pacific area for neighborhood and community park, including <br />improved connections, recreation and open sace <br />4 <br />Acquire 100+ acres surrounding Golden Gardens ponds for community park <br />4 <br />Develop Golden Gardens and acquired property as community park with significant <br />natural area components and trails <br />5 <br />Develop neighborhood park site (B3) <br />4 <br />Acquire land for natural areas to complete Rivers to Ridges farmland connections <br />• <br />Provide synthetic surface field to serve Bethel/Danebo in partnership with school district <br />5 <br />1 <br />Develop a running trail to serve the Bethel area <br />2 <br />Develop soccer fields at Bethel Community Park <br />3 <br />Develop trails within West Eugene Wetland sites <br />3 <br />Provide trailheads and interpretive facilities within existing WEW sites <br />4 <br />Provide major community center on west side of Beltline to serve Bethel <br />5 <br />Develop an off leash dog area in Bethel/Danebo <br />5 <br />Develop pedestrian trails along Greenhill Tributary <br />5 <br />Develop pedestrian trails within Golden Gardens <br />5 <br />Develop 4 tennis courts at Bethel Community Park <br />5 <br />Develop multi -use path to Fern Ridge <br />Upgrade State Street Park <br />5 <br />1 <br />Complete Petersen Barn Park, including parking revisions <br />2 <br />Improve Echo Hollow Pool <br />4 <br />Improve Tennis Courts at WHS in partnership with Bethel School District 52 <br />4 <br />Expand Petersen Barn Community Center <br />5 <br />Complete Irwin Park <br />5 <br />Complete development of Candlelight Park <br />Provide access improvements at Golden Gardens <br />5 <br />1 <br />Develop access improvements between Bethel parks, schools and neighborhoods to <br />WEW system and bikes stem <br />3 <br />Develop access improvements to meet neighborhood park needs (B2) <br />4 <br />Develop access improvements to serve this neighborhood (B6) <br />4 <br />Improve Royal Avenue to enhance Bethel park/school connectivity <br />4 <br />Acquire land to provide connectivity north and east from Bethel to Santa Clara area <br />5 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.