<br />4) <br />5) <br />6) <br />7) <br />8) <br />The above listed first-tier subcontractor(s) will provide labor or labor and materials with a Dollar <br />Value equal to or greater than: <br />a) 5% of the total Base Bid amount less deductive altemates, if any, or $15,000, whichever is lazger. <br />If the Dollaz Value is less than$15,000 do not list the subcontractor above; or <br />b) $350,000 regazdless of the percentage of the total contract price. <br />FAILURE TO SUBMIT THIS FORM BY THE DISCLOSURE DEADLINE WILL RESULT IN A <br />BID SUBMITTED BECOMING NON-RESPONSNE, AND SUCH BIDS SHALL NOT BE <br />CONSIDERED FOR AWARD. <br />