5129334965223Airport Improvement Projects 0001,029,422.000.00199,123.18830,298.82(199,123.18) <br />965243APT Upgrade HVAC system 0002,358,556.000.00(638.50)2,359,194.50638.50 <br />881(861,929.00)0.004,695.98(866,624.98)(4,695.98) <br />975192APT-Alpha Rehab A1-A3 2007 000600,639.000.00(3,394.50)604,033.503,394.50 <br />881(663,514.00)0.003,673.50(667,187.50)(3,673.50) <br />999(7,520.00)0.000.00(7,520.00)0.00 <br />975212APT Hollis Taxiway Ext 000100,264.000.000.00100,264.000.00 <br />279(86,527.00)0.000.00(86,527.00)0.00 <br />999(7,844.00)0.000.00(7,844.00)0.00 <br />975226APT- Flightcraft Improvements 000110,335.000.008,320.00102,015.00(8,320.00) <br />975262APT Jet Bridge Replacement (2)000977,372.000.00(1,327.36)978,699.361,327.36 <br />881(905,355.00)0.006,627.18(911,982.18)(6,627.18) <br />975272APT- Air Cargo Expansion 2007 0001,365,406.000.00(2,102,828.79)3,468,234.792,102,828.79 <br />279(300,881.00)0.00(1,488.00)(299,393.00)1,488.00 <br />2900.000.0073,743.03(73,743.03)(73,743.03) <br />999(44,579.00)0.00(44,579.13)0.1344,579.13 <br />975312APT-Air Cargo Warehouse 0003,386,611.000.00(683,084.54)4,069,695.54683,084.54 <br />290(1,354,143.00)0.001,498,584.88(2,852,727.88)(1,498,584.88) <br />975372APT Parallel Runway Phase VII 000775,371.000.000.00775,371.000.00 <br />276(596,442.00)0.000.00(596,442.00)0.00 <br />881(101,391.00)0.000.00(101,391.00)0.00 <br />999(121,511.00)0.000.00(121,511.00)0.00 <br />975380APT Master Plan Update 000451,367.000.00(39,873.38)491,240.3839,873.38 <br />277(320,726.00)0.0085,571.00(406,297.00)(85,571.00) <br />999(607.00)0.000.00(607.00)0.00 <br />975389APT Access Control Phase II 000198,952.000.000.00198,952.000.00 <br />276(9,413.00)0.000.00(9,413.00)0.00 <br />975432APT- Deicing Station 00028,151.000.000.0028,151.000.00 <br />985412APT S Ramp Recon (mid-section)2800.000.0029,080.00(29,080.00)(29,080.00) <br />APT-Ramp Reconstruct 2008 000(22,903.00)0.00(21,372.79)(1,530.21)21,372.79 <br />985452APT LIFE FLIGHT SITE 0006,062.000.0031,210.62(25,148.62)(31,210.62) <br />985493APT Baggage Screening Area 0001,401,184.000.000.001,401,184.000.00 <br />985543APT Terminal Seating Rplcmt 00047,394.000.0012,666.9634,727.04(12,666.96) <br />995392APT Terminal Ramp Rehab Ph I 000(2,925.00)0.00(2,924.53)(0.47)2,924.53 <br />881(67,834.00)0.0081,657.72(149,491.72)(81,657.72) <br />995412APT Expand Air Cargo Phase II 2800.000.001,941,040.00(1,941,040.00)(1,941,040.00) <br />2900.000.00102,160.00(102,160.00)(102,160.00) <br />995432APT Air Cargo Exp Ph3 2900.000.0049,799.02(49,799.02)(49,799.02) <br />995032Airport- B-Gates/Covered Walks000(594.00)0.00(594.00)0.00594.00 <br />512 Total5,355,277.000.001,265,634.814,089,642.19(1,265,634.81) <br />5319332905116L Amazon Floodplain Analysis 0001,450.000.000.001,450.000.00 <br /> <br />