New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4598 PAF 10.27.08
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4598 PAF 10.27.08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:47:01 AM
Creation date
10/31/2008 11:19:22 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
004598
GL_Project_Number
995482
Retention_Destruction_Date
10/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 2009 Rehab North Ramp at South Kilo <br /> 10/20/2008 <br /> Estimate Pre Design <br /> 8" HMA on 14" CTB on 6" rock <br /> 40000 sf <br /> Unit <br /> Unit Qty Cost Total <br /> mob-10% Is 1 $ 42,158 $ . 42,158 <br /> SafetylSecurity Is 1 $ 50,000 $ 50,000 <br /> Erosion Control Is 1 $ 1,000 $ 1,000 <br /> Unclassified Excav cy 3457 $ 16 $ 55,309 <br /> <br /> AC 8" to 1500 $ 80 $ 120,000 <br /> Subbase Course, 6" sy 4444 $ 10 $ 44,444 <br /> CTB sy 4444 $ 22 $ 97,778 <br /> Geotextile Fabric sy 4444 $ 2 $ 8,889 <br /> Striping sf 400 $ 5 $ 2,000 <br /> $ 421,578 <br /> contingency 10% 42,157.75 <br /> testing $ 5,000 <br /> Aiport Admin $ 3,000 <br /> PrintinglAdvertising $ 1,000 <br /> Warranty $ 500 <br /> engineering 16% 67,452.40 <br /> TOTAL: $ 540,888 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.