<br /> 2009 Rehab North Ramp at South Kilo <br /> 10/20/2008 <br /> Estimate Pre Design <br /> 8" HMA on 14" CTB on 6" rock <br /> 40000 sf <br /> Unit <br /> Unit Qty Cost Total <br /> mob-10% Is 1 $ 42,158 $ . 42,158 <br /> SafetylSecurity Is 1 $ 50,000 $ 50,000 <br /> Erosion Control Is 1 $ 1,000 $ 1,000 <br /> Unclassified Excav cy 3457 $ 16 $ 55,309 <br /> <br /> AC 8" to 1500 $ 80 $ 120,000 <br /> Subbase Course, 6" sy 4444 $ 10 $ 44,444 <br /> CTB sy 4444 $ 22 $ 97,778 <br /> Geotextile Fabric sy 4444 $ 2 $ 8,889 <br /> Striping sf 400 $ 5 $ 2,000 <br /> $ 421,578 <br /> contingency 10% 42,157.75 <br /> testing $ 5,000 <br /> Aiport Admin $ 3,000 <br /> PrintinglAdvertising $ 1,000 <br /> Warranty $ 500 <br /> engineering 16% 67,452.40 <br /> TOTAL: $ 540,888 <br /> <br />