New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4575 Warranty 3rd note 10.21.08
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4575 Warranty 3rd note 10.21.08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 11:17:45 AM
Creation date
10/30/2008 8:31:06 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004575
GL_Project_Number
374575
COE_Contract_Number
2009-00502
Retention_Destruction_Date
10/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and Public Works <br /> Completion Dates for Contract Projects Engineedng <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5580 <br /> DATE CONTRACT NO. <br /> 10/21!2008 2009-502 <br /> PROJECT NAME JOB NO. <br /> U of O Baseball Park Stonn Drain Improvements 4575 <br /> CONTRACTOR FEDERAL AID PROJECT NO: <br /> Delta ConsUUCtion Co. <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Josh Pinkham 541 682.8473 <br /> FIRST NOTIFICATION <br /> 09V1&081S THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 001&1.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> WA 0 10/17!08 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 10/21/0815 THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE W ITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT k3, J14, and N5, ALL WORK IS <br /> GUARANTEED BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. <br /> MANUFACTURE WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN <br /> THE REQUIRED ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN <br /> WORK THAT BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR <br /> WARRANTY PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPT C O T E REPAIR. <br /> Inspector Signature <br /> For Privately Engineered Projects Only <br /> Engineer: Balzhiser & Hubbard <br /> Address: 100 W 13~ Avenue <br /> Eugene OR 97401 <br /> Owner: Rose DeBono <br /> Address: 1295 Franklin Blvd <br /> Eugene OR 97403 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Omer Construction Manages File Ginger Perales, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As ConsWCt Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ-514575\Correspondence\Contraclors44575 200801021 Third Notification.doc APR2 2ooa <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.