CONSULTING ENGINEERS fOR PAVEMENTS <br /> PAVEMENT SERVICES, 1 NC. 541 N.E. 20" AVENUE, SUITE 107 <br /> PORTLAND, OREGON 97232-2862 <br /> 503.235.0377 • FAX 503.235.2885 <br /> PSI®PSIPDX.COM <br /> 9~ <br /> March 18, 2005 2 <br /> f <br /> Mr. Matt Rodrigues <br /> Eugene Public Works Engineering OS <br /> 244 E Broadway <br /> Eugene, OR 97401 <br /> Re: 2007 Pavement Preservation Program <br /> Revised Pavement Design Proposal <br /> Dear Matt, , <br /> As you requested, this is our revised proposal to provide pavement design recommendations for the <br /> street segments included in the Febniaty 10, 2005 revised list of 2007 Pavement Preservation Program <br /> (PPP) projects that includes the street segments listed below. <br /> 2007 Pavement Preservation Pr ents -Table 1 <br /> Street From To # Lanes Pavement Len , ft <br /> Coun Club Rd. Willa ' les ie Southwood 2 AC 3,473 <br /> Willa illes ie Rd. Cal Youn Coun Club 2 AC 5,152 <br /> god Ave. Blair Ga~eld 2 AC 2,932 <br /> S rin Blvd. Ove ass Firland ~ 2 AC 2,712 <br /> Firland St. S A ate 2 AC 685 <br /> A ate St. Firland Black Oak 2 AC 1,317 <br /> Warren St Baile Hill Warren 2 AC 2,010 <br /> Gilham Rd. Crescent Willona 2 AC , 1,414 <br /> Hil and St. 30d' 34`~ 4 AC 1,445 <br /> Jefferson St. 7d' 8`~ 2 AC/PCC 473 <br /> Willamette St. 306'N of 29th 47d' 4/2 AC/PCC 8,119 <br /> Fox Hollow Rd. Amazon Donald 2 AC 7,055 <br /> Railroad Blvd. Van Buren Chambers 2 AC 3,031 <br /> Bar er Dr. Primrose Te 2 ACP ~ 3,188 <br /> Total Len th 43,006 <br /> The segments lengths shown above were taken from the City's pavement management system database <br /> and were used to estimate our effort for deflection testing, pavement coring, subgrade soil investigation <br /> and visual surveying. <br /> Services Provided by the City <br /> <br /> We have assumed that the City will provide the following information for the design analysis: <br /> ¦ traffic volume counts classified by truck axle category and estimates of traffic growth rate <br /> during the design period <br /> ¦ weekly bus volumes for each route on the project segments <br /> ¦ as built information for the segments <br /> ¦ base maps of the street segments with the basis for the project stationing <br /> <br />