<br /> Run Date: 11,/07/2007 16:30:58 Page 3 <br /> City of Eugene <br /> :on[ract Preliminary Progress Payment <br /> Paysaat No : 004 <br /> Contractor: EUGENE SAND b GRAVEL Original Contract: $1,186,499.10 <br /> lob N: 93-004341 Current Amount: $1,192,002.64 <br /> Contract No: 2007-00026 Contract Award Date: 06/25/2007 <br /> PO p: 2007100421 Completion Date: 11/01/2007 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 8 Canplete <br /> Line Description Last Chng Ozd Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0210 PIPE TEES, 10 INCH %A'i~j $300.00 EACH 1.000 $300.00 0.000 $0.00 1.000 $300.00 100.00 <br /> 0220 REM/REPL CATCHBASIN W BIKE PRO ~D~'7D $1,500.00 EACH 1.000 51,500.00 0.000 $0.00 1.000 $1,500.00 100.00 <br /> 0230 CURB INLET 4 A /ob9D $1,800.00 EACH 3.000 $5,400.00 0.000 50.00 3.000 55,900.00 100.00 i. <br /> 0240 CATCH BASIN TRAP 5500.00 EACH 2.000 $1,000.00 0.000 $0.00 1.000 $500.00 50.00 <br /> 0250 ADJUSTING BOXHS $300.00 EACH 2.000 $600.00 0.000 $0.00 2.000 5600.00 100.00 <br /> 0260 MINOR ADJUSTMENT OF MANHOLBS $1,000.00 EACH 16.000 $16,000.00 0.000 $0.00 16.000 $16,000.00 100.00 <br /> 0270 MH REM/REPL FRAME/COVER-WW I~ $250.00 EACH 13.000 $3,250.00 0.000 50.00 8.000 $2,000.00 62.00 <br /> 0280 IIX R06/ASPL FRAIQH/COVER-8T $250.00 HACN 3.000 5750.00 0.000 $0.00 7.000 $1,750.00 233.00 <br /> 0290 TRENCH GRATE W 5150.00 SQFT 30.000 $4,500.00 0.000 $0.00 30.000 $4,500.00 100.00 <br /> 0300 PLUG fiX. PIPE HND NITN CONCRET °J $100.00 EACH 2.000 $200.00 0.000 $0.00 2.000 $200.00 100.00 <br /> 0310 RETAINING WALL, MSE $21.00 S PT 870.000 $18,270.00 0.000 $0.00 531.000 511,151.00 61.00 <br /> 0320 COLD PLANB PVM'I RID40VAL, 2• D $0.50 9QPT 26,910.000 $13,455.00 0.000 $0.00 41,903.000 $20,951.50 156.00 <br /> 0330 COLD PLANE PVMT REMOVAL, 4" DE $0.50 SQFT 44,619.000 $22,309.50 0.000 $0.00 33,654.000 $16,827.00 75.00 <br /> 0390 COLD PLANE PVMT REMOVAL, VARIA I~D $0.40 SQFT 43,370.000 $17 348.00 0.000 50.00 42,744.000 $17,097.60 99.00 <br /> 0350 COLD PLANfi PVMT RfiMOVar. n• TO S0.50 SQPT 8,520.000 $4,260.00 0.000 $0.00 4,350.000 52,175.00 51.00 <br /> 0360 1 1/2• - 0• AOORSOATS BASB~~ $20.00 TON 110.000 $2,100.00 0.000 $0.00 305.200 $6,104.00 277.00 <br /> 0370 LEVEL 2 3 8 IN DENSE HMAC $75.00 TON 245.000 $18,375.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0380 LEVEL 2, 1/2 IN DfiNSE HMAC 550.00 TON 2,280.000 $114,000.00 0.000 $0.00 2,253.800 $112,690.00 99.00 <br /> 0390 PLAIN CONCRETE PVMT, UNDOWELED /UVDyb $7.00 SQFT 4,850.000 $33,950.00 0.000 $0.00 2,593.000 $18,151.00 53.00 <br /> 0400 PLAIN CONCRETE PV MT, DONfiLED, / $17.00 S FT 55.000 $935.00 0.000 $0.00 50.200 853.40 91.00 <br /> 0401 CONST. REINFORCED DWY 001 (~yQ $7.94 SQFT 371.000 $2,945.74 371.000 $2,945.74 371.000 52,945.74 100.00 <br /> 0410 CONCRETE CURBS $18.00 FOOT 814.000 $14,652.00 0.000 $0.00 771.700 $13,890.60 95.00 <br /> 0420 CONCRETfi CURE AND GUTTER l $25.00 FOOT 1,265.000 $31,625.00 0.000 $0.00 1 392.500 $33,562.50 106.00 <br /> 0430 MOUNTABLE CURB AND GUTTER ~ ~O Q!/J $30.00 FOOT 13.000 $390.00 0.000 $0.00 13.000 $390.00 100.00 <br /> <br />