New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Hospital Site Analysis
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Hospital Site Analysis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:58:24 AM
Creation date
10/8/2008 3:52:38 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Development
PW_Subject
Potential Hospital Site Analysis
Document_Date
2/22/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;~ y ,~-~~~. <br />MEMOR.ANI~UM <br />_ .. _ _ __ _ <br />- <br />- - ---_ <br />ate: e ruary ; <br />To: Planning & Development Department <br />From: Gary McNeel, Sr. Transportation Analyst <br />Public Works Engineering - Team Central <br />Subject: Potential Hospital Sites Analysis <br />Public Works <br />Engineering <br />Team Central <br />City of Eugene <br />858 Pearl St 3~d Floor <br />Eugene, Oregon 97401 <br />(541)682-5291 <br />(541) 682-5598 FAX <br />vwvw.eugene_or.gov <br />We have performed a review of six of the potential hospital sites with a focus on any obstacles, in terms <br />of transportation and other readily identifiable service needs, and the potential for mitigation or other <br />offsetting measures•and some very rough reconnaissance level estimate of costs. <br />Cobur~ 4J/E~WEB. This 35 acre site (17-03-16-22, TL 101 and 102) is currently mostly undeveloped <br />(TL 101 is an EWEB substation site) and has a 60' wide R/W stub to Coburg Road and the full build-out <br />of the Crescent Village PUD to tHe south will extend Shadow View Drive up to the southerly- bouridary of <br />TL 102: ;Ttie site is bordered to the east by an undeveloped City park, to the southeast by a future phase <br />of the C`r,'escent Village mixed use development, on the southwest by the unincorporated (outside City <br />Limits) Kinriey Loop low derisity (single family homes on 0.21 to 1.37 acre lots) residential area, and to <br />the west by; a'platted but undeveloped Northern Territories subdivision (which is having some difficulty <br />providing wastewater service to the development). It appears that feasibte gravity wastewater to the site <br />would require about 1,850 feet of off-site pipe extension at an estimated cost of $100,000 <br />The site is, not annexed to the City with underlying AG - Agricultural zoning on TL 102 and R-1 - Low <br />density residential on TL 101 (all.designated on the Metro Plan for R-1 low density residential). Sales of <br />comparable land in this area have ranged from $20-$25 per square foot. This parcel is not within a flood <br />zone and site preparation would not require additional fill to meet bfe requirements. Assuming that <br />buildout could utilize 80% of the 35 acres (20% reduction for streets and rights-of-way), 28 acres divided <br />into 6,000 square foot lots would yield 203 lots at a density of 7.25 units per acre (about half of maximum <br />per Table 9.2750. This level of LDR development would generate approximately 1,945 daily trips, 150 <br />during the AM and 205 during the PM peak hourly periods. <br />The Transportation Impact Analysis (TIA) previously performed evaluated a 423,000 square foot <br />Hospital and 100,000 Medical Office Building, which using the Kittelson equation for a co-located <br />Hospital and MOB projected about 11,000 daily trips with 780 during the AM and 855 during the PM <br />peak hours. The impacts of a potential increase of about 630 AM and 650 PM trips would need to be <br />evaluated against the capacity and operational aspects of roadways adjacent to or downstream of the site, <br />with trips distributed across available routes. Using a distribution pattern similar to that evaluated for the <br />Delta Ridge site (zip code based), we could anticipate 55% to 60% of the trips using Coburg Road north <br />of Beltline, with 30-35% to and from Coburg Road to the south. There would also be demand to and <br />from the east that could be better served via North Game Farm Road and Crescent Avenue once Shadow <br />View Road is fully extended. A minor amount of demand would utilize Coburg Road to and from the <br />north and Crescent Avenue to and from the west. <br />Page ], of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.