New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4518 Warranty 10 month
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4518 Warranty 10 month
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:39:49 AM
Creation date
10/7/2008 10:48:08 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004518
Retention_Destruction_Date
12/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ O M O I~iTH WAR RAI~iTY <br />II~iSPEGTIOI~i <br />The project listed below will satisfy its one year warranty obligation in the next 60 days. <br />Please provide a warranty inspection on the project. <br />It is the intent of this a-mail to coordinate the inspection efforts of the PWE and PWM <br />staff on all Capitol Improvement Plan (CIP) projects and Privately Engineered Public <br />Improvement (PEPI) projects prior to the expiration of the one year warranty period. In <br />general, the role of the PWM Staff will be to provide expertise, advice, and assistance to <br />the PWE Staff by performing a final inspection of the below listed project within the next <br />four (4) weeks. It is the responsibility of the PWM supervisors to a-mail deficiencies to <br />the inspector initiating this a-mail. It is the responsibility of the inspector to compile all <br />deficiencies and review them with the Construction Manager prior to contacting the <br />prime contractor. If you do not respond to this a-mail within four weeks we will assume <br />you found no deficiencies. <br />At the time of this request it is the responsibility of the PWE inspector to provide to PWM <br />a usable cover sheet, in a size appropriate to the scope of the project, with the <br />infrastructure numbers and locations indicated when lines are to be tv'd. <br />The job number is no longer active and is listed as a reference number only. <br />Responsibility for administering the project and enforcing project requirements remains <br />with the PWE Staff and all communication with the contractor will go through the project <br />inspector who initiated this a-mail or through the PWE Construction Managers. <br />Please call if you have any questions. <br />Job Name: Acorn Park Basketball Court <br />Contract number: 2008-12 Job Number: 4518 <br />One Year Warranty Will Expire On: 12/1/2008 <br />Contractor: Scott Brown Construction <br />Inspector & Phone Number: Scott Milovich 682-6086 <br />Project & Description: <br />® Landscape ^ Storm Drain ^ Wastewater ^ Curb & Gutter <br />^ Sidewalk ^ HMAC ^ Erosion Control ^ Illumination <br />^ Traffic Signals ^ Permanent Signs ^ Permanent Striping <br />® Other Concrete flat work and basketball standards <br />C:\Documents and Settings\cewmkla\Local Settings\Temporary Internet Files\OLK24\4518-10 MONTH WARRANTY <br />INSPECTION.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.