New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
ODOT (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
ODOT (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:59:08 AM
Creation date
10/6/2008 2:41:16 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Contracts
PW_Subject
1968-00701 Landscaping
Document_Date
10/7/1968
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TOM McCALL <br />GOVERNOR <br />GEORGE M. BAIDWIN <br />Administrator of Highways <br />OREGOIV STATE <br />HIGHWAY DIVISION <br />HIGHWAY BUILDING • SALEM, OREGON • <br />Eugene City Council <br />City Hall <br />Eugene, Oregon 97401 <br />Attn: Mr. Hugh McKinley <br />City Manager <br />Gentlemen: <br />May 29, 1973 <br />~ ~ ~ <br />~1~~ <br />MA ~, L~ <br />3 p 19~3 <br />U~P~• ~F <br />CITy O~ ,EV~ ~Q.RKs <br />~~~ <br />The Oregon State Highway Division has negotiated a "~ <br />Price Agreement with the Donald M. Drake Co. who has the contract <br />for work on the 7th Avenue-Willamette River Section of I-105. <br />The attached detailed cost estimate stipulates quantitites and <br />unit prices for work necessary to upgrade Washington and Jefferson <br />Streets from ist Avenue to 6th Avenue by overlaying the entire <br />street with 2 inches of asphaltic concrete, constructing new <br />curbs on the west side of Washington and east side of Jefferson <br />and removing and replacing sections of the existing concrete <br />slabs that are broken and unstable. <br />The total cost of the work has been estimated to be <br />$53,485•31 with the State share being $34,377.40 and the City <br />share being $19,,107.91. The Donald M. Drake Co. is prepared to <br />begin work upon deposit of the City's share of the estimated cost. <br />If this proposal is acceptable to the City Council, please <br />forward your check or warrant in the amount of $19,107•91 to <br />Mr. H. S. Cox, County and City Engineer, State Highway Builiiing, <br />Salem 97310. <br />We appreciate your continued interest and cooperation in <br />highway related matters. <br />_ ~ <br />c',~ <br />~~ <br />MCH:Ijt <br />Very truly yours, <br />H. S. Cox <br />County and City Engineer <br />By <br />~~Ll~to~ CD. ~ <br />Mainor C. Holmes <br />Office Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.