The cost assumes a samp:le size of 400 (Standard Error = 5.0). The study <br />includes project management, administratiorr of:the teTephone survey, <br />supervision and monitoring, coding, data entry and processing, and <br />statistical abstracts. <br />Cost per three question survey $1,5D0 <br />Focus Grouas ~. <br />The cost inc~udes two focus groups. The cost figure assumes that the <br />contractor will be responsible for (1) developing the actual focus - o <br />groups moderator outline(s), ('2) cooperating with City staff and other <br />consultants hired by the City in developing the moderator outline(s), <br />(3) conducting the actuaT focus group discussions, (4) providing an <br />audio tape of the sessions, and (5) producing`a report of the focus <br />group results including'a verbatim transcript and major findings. The <br />cost figure assumes~that the City will° be responsible for recruiting <br />participants and providing focus group rooms and refreshments. <br />Cost for two focus groups $3,500 <br />The City agrees to perform the following tasks: <br />1.7 The City shall:provide the Contractor with all the reasonable, <br />necessary and available data and information necessary to perform requested <br />services'. <br />1.8 The City Planning.Development Department shall cooperate with the <br />Contractor to the extent reasonably required by the circumstances where a <br />joint effort is indicated. <br />1.9 The City will arrange with the Lane County Elections Division to <br />provide a list of frequent voters in the precincts comprising the River Road <br />area. <br />1.10 The City will make a17 arrangements for focus graups other than <br />preparation of the moderator's outline(s), moderati`ng the groups and report- <br />ing. The City will arrange for facilities, incentives, recruit participants, <br />and perform other related tasks. <br />2. Time for Completion. <br />Contractor shall commence the work on January 17, 1990, and shall com- <br />plete the work prior to Mar.ch 30, 1990. <br />Personal Services Contract..- 3 <br />