DEPARTHENT OF ENVIRONMENTAL QUALITY (DEQ) <br />STATE REVOLVING IAAN FUND FINAL APPLICATION <br />SRF Project ID Number: NFDES/GIPGF Permit Nurnber: 3721-v <br />SRF Priority List'Rank: 1 Congressional District Number: <br />l. PUBLIC AGENCY: ~y of Eunene Public Plorks ~enartment ~ <br />Mailing Address: fi5$ PP~r1 Street , Euaene. Orenon Q7401 Lane <br />Street City Zip County <br />2. NAME AND SCOPE OF THE PROJECT: (Briefl.~ describe project and indicate which <br />part(s) are to be funded by $RF.) River.~oad Se~r~er Collector Basins D, E, & F. <br />Installation of Q1,0!l0 linear feet of se4ler collectors to provide se~~-er service to <br />an~roximately one-third of developed properties in the I?iver Road area. Additional <br />~roperti es !-ii 11 .be served by nro.~ects i n future _years . <br />3.' STAGE OF PROJECT`: (Identify which stage of the project will be funded with the <br />SRF loan.) " <br />~ Facility Plan Q.Design and Construc'tion ~ Q Construction only <br />4, PROPOSED TOTAL PROJECT FINANCING SOURCES AND USES: <br />. <br />Sources of Funds Uses of Funds <br />Type ' Ainount Type Amount <br />SRF Loan <br />EPA Constr. Grant <br />FmHA Loan <br />FmHA Grant, <br />Oregon CDBG <br />G:O. Bonds <br />Revenue Bonds <br />Other: <br />3ond An±iei~ation . $ l,'917,776 <br />-~- <br />-~- <br />-0- <br />-~- <br />-~-' <br />~-~- <br /> <br />5.36$.324 Land Costs <br />Reiocation Costs <br />Site Work <br />Construction <br />Contingency' <br />Eguipment <br />Engineering - Planning <br />Engineeririg.- Design <br />i Engineering - Construc. $ -~- <br />'~' <br />'~' <br />4,999,000. <br />49Q,~00 <br />' ' <br />'~- <br />345.,000 <br />699,8Q0 <br />NOteS~`" Administration'& Legal 275,J0~ <br /> Financing Cost , n~7.n00 <br />" Capitalized Interest -0- <br /> Loan Reserve -0- <br /> Other: <br /> I <br /> <br /> <br /> <br />TOTAL SOURCES $ 7.286.100 TOTAL USES $ 7,2£36,100 <br /> <br />SRF EINAL APPLICATION Page 1 of 4 <br />CG/WH3554G (09/90) <br />