~~ ~,.-- ~'`~~S°`` b'~ `~ <br />~ <br />~ "' N' ~d tr~1d ~,~e2 ~ <br />2 o . . r~'S`/ <br />Z, <br />,~-- <br />~t,~ <br />~~~` ~~ ~~~~ ' - <br />, <br />~ <br />~~ ~ <br />Mob <br />1500 LS 1 1500 Based on hwy tech phone quote <br />TPDT 1500 LS 1 1500 guestimate <br />Wood Sign Posts 150 EA 33 4950 based on ODOT avg prices FBM <br />Square Tube Sign Supports 225 EA 33 7425 Based on 4325 <br />Speciaity sign 165 SF 33 5445 Based on 4325 <br />SIGN SUPPORT FOOTINGS (SQUARE TUBE) 110 EA 33 3630 Based on 4326 <br />SIGN SUPPORT FOOTINGS (WOOD PVC) 45 EA 20 900 guestimate <br />CORE DRILLING CONCRETE WALKS 25 EA 20 500 guestimate <br /> 25850 <br />OPTION A(WOOD POSTS) unit price unit quanitity total cost <br />MOB 1500 LS 1 1500 <br />TPDT 1500 LS 1 1500 <br />WOOD SIGN POSTS 125 EA 33 4125 <br />CORE DRILLING CONCRETE WALKS 25 EA 20 500 <br />Speciaity sign 30 SF 165 4950 <br /> 12575 381.0606 Cost per sign <br /> °.,J~f/J`C'i,C~ c'-~e'Td4-L5 <br />OPTION B (SQ TUBE) <br />MOB 1500 LS 1 1500 <br />TPDT 1500 LS 1 1500 <br />Square Tube Sign Supports 225 EA 33 7425 <br />SIGN SUPPORT FOOTINGS (SQUARE TUBE) 110 EA 33 3630 <br />CORE DRILLING CONCRETE WALKS 25 EA 20 500 <br />Specialty sign 30 SF 165 4950 <br /> 19505 591.0606 cost per sign <br />~ <br /> ~~lrv~Cj~ csf0i"r~C_5 <br />