New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Tim Crowe
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Tim Crowe
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:59:45 AM
Creation date
10/3/2008 2:05:51 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Contracts
PW_Subject
1997-00333 Design riverbank path Marist HS
Document_Date
7/13/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ s <br />.. . <br />EXHIBIT B <br />SCOPE OF WORK <br />City wishes to conduct a design charette to consider options which would mitigate the <br />installation of a public path along the riverbank edge of the campus of Marist High School, a <br />private Catholic school with a closed campus atmosphere. <br />The design charette is expected to include the consultant, a private landscape architect, a private <br />engineer, staff and representatives from the City and Marist. <br />The agenda for the design charette shall include the following: <br />• an onsite inspection of the campus, <br />~ a review of proposed path alignment, and <br />• a discussion of suggested design and operational improvements <br />Services <br />Contractor would advise Marist representatives and City staff and elected officials on safety <br />considerations which could help the school to operate without undue impact from the path, help <br />protect its students, and help protect the facilities owned by the school. <br />Standard Contract Provisions--Page 4 <br />(Revised November 1994) <br />
The URL can be used to link to this page
Your browser does not support the video tag.