~i"-~ .:• <br />i " <br />3. Printing of additional revised documents: $5,300. <br />This task inc(udes: <br />Draft Public Facilities and Services Plan <br />154 pages (77 double-sided) , <br />_ front and back paper covers -. <br />8 11X 17 white maps <br />$12.25 per copy coil bound <br />$3,675.00 for 300 copies <br />$10.75 per copy with two staples <br />$3,225.00 for 300 copies <br />Technical Report - <br />64 pages (32 double-sided) <br />11--11 X 17 color copy maps <br />front and back cardstock covers <br />Coil bound <br />$21.65 each <br />$1625.00 for 75 copies <br />This estimate assumes printing of : ~ <br />• 300 copies of the draft plan, including Z-fold maps, for distribution to the public and <br />agencies, and local officials _ <br />• 75 copies of technical report, including color maps, for distribution to agencies, planning <br />commissions, and elected officials <br />In-house printing costs are covered in LCOG's billing rates. The cost of the final plan is covered <br />by the sale price. IndivicJual agencies can order ~nal plans and LCOG can direct bill for those. <br />Total additionai costs: $25,000. <br />Breakdown by Agency: <br />Rainbow Water District 1.2% $. 300 <br />SUB 7.5 1,875 <br />City of Springfield . 15.4 3,850 ~ <br />EWEB 26.0 . 6,500 <br />City of Eugene 49.9 12,475 . <br />LCOC: \\CLSRV1231LCS\CONTRAC7~METRO~EUCPFP-FYOI.DOC <br />Last Saved: August .i0, 2000 ,. ' <br />3 <br />