, -~ <br />: <br />3. Printing of additional revised documents: <br />This task includes: <br />Draft Public Facilities and Services Plan <br />154 pages (77 double-sided) <br />front and back paper covers <br />8 11X 17 white maps <br />$12.25 per copy coil bound <br />$3,675.00 for 300 copies <br />$10.75 per copy witli two staples <br />$3,225.00 for 300 copies <br />Technical Report <br />64 pages (32 double-sided) <br />I 1--11 X 17 color copy maps <br />front and back cardstock covers <br />Coil bound <br />$21.65 each <br />$1625.00 for 75 copies <br />This estimate assumes printing of : <br />$5,300. <br />• 300 copies of the draft plan, including Z-fold maps, for distribution to the public and <br />agencies, and local officials , <br />• 75 copies of technical report, including color maps, for distribution to agencies, planning <br />commissions, and elected officials <br />In-house printing costs are covered in LCOG's billing rates. The cost of the final plan is covered <br />by the sale price. Individual agencies can order final plans and LCOG can direct bill for those. <br />Total additional costs: $25,000. <br />Breakdown by Agency: <br />Rainbow Water District 12% $ 300 <br />SUB 7.5 1,875 <br />City of Springfield 15.4 3,850 <br />EWEB 26.0 6,500 <br />City of Eugene 49.9 12,475 <br />LCOC: \\CLSRVI2S~L.GS~CONTRAC7~MEI'RO~EUGPFP-FYOI.DOC <br />Lact Snved: August 30, 2000 <br />3 <br />