Engineering and <br />Construction Agreement <br />~ Public Works <br />c....:...,,,.:.._ <br />City of Eugene <br />Job Number: ~~~i' Contract Number. 244 E. Broadway <br />Eugene, OR 97401 <br />,Office File Number: Capital Project Number: (541) 687-5560 <br />FAX: (541) 984-841.0 <br />The undersigned Owner requests the Public Improvements as described below: ~= (~1) 687-5245 <br />Type of improvement: <br />Location: <br />North or east limit:. <br />(Paving, saillfary sewer, storm sewer, sidewalk, etc.) <br />.r r, zt <br />(Street or easement. If a subdivision, grin subdivision name) <br />(except for subdivisions) <br />South or west limit: <br />(except for subdivisions) <br />be designed and constructed during the ~~D ~ or subsequent construction season in the following manner (check one): <br />(Year) <br />G 1. As a City engineered and constructed project (eligible for assessment financing). <br />City agrees: <br />a) to perform engineering design, cost estimate, award of contract, construction. inspection, and assessment <br />tabulation for the improvements; <br />b) to participate in the cost of necessary additional capacity of improvements beyond the assessable amounts <br />as stipulated in the Eugene Municipal Code. <br />Owner agrees: <br />a) to pay all engineering and construction costs which are not eligible for assessment financing. <br />b) if the undersigned owner chooses to discontinue the City engineering and construction process prior to <br />execution of a construction contract, the owner further agrees to pay a!I engineering and other project-related <br />/ costs incurced by the City to that point, and.to comply with paragraph 2 below, if applicable: <br />t1G 2. As a privately engineered and constructed project. with private financing arcanged by the Owner. '~ <br />Owner agrees: <br />a) to install all required public improvements at no cost to the City; <br />b) to pay actual City costs incurred for plan review and processing, inspection, materials testing, and other <br />engineering services, all of which will be billed and payable monthly with final payment due prior to City's <br />final acceptance of the completed improvements: <br />c) to provide the City a bond, which includes aone-year warrarrty period, in anamount sufficient to cover all engineering and <br />construction costs assoaated with completion of the required public improvements. <br />d) to pay other charges and' levies for public improvements, 'rf required. Other charges may include, but are not limited to: <br />1) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br />owner shall be charged a penalty in the amount of $25 or ten percent (10%) of the past due amount, whichever is <br />greater. Payment of the penalty shall not consitute a waiver by the City of its other remedies. <br />2) interest charges: property owner shall pay interest oh all past due amounts at the rate of eighteen percent (18%) <br />per annum from the due date until paid: This sum shall be in addition to penalty charges. <br /> CO-0WNER <br /> <br />iER'S NAME ~ <br /> <br />SIGNATURE <br />~~ r~ ~ ~ 8 <br />. <br />DATE <br /> <br />ADDRE <br />~~ ~ <br />e <br />~~ ~6~T.E / ~ ~ ~ V 1 l~/ <br />PHONE NUMBER (business hours) <br />OF EUGENE <br />tGNAT RE -- <br />TITLE ~ - ~ ~ ~~ <br />DATE <br />777 PEARL STREET <br />EUGENE, OREGON 97401 <br />vnwwri~ i p~ I r YEU.OW /OWNER PINK /ENGINEERING ~ AUCdUST 1996 <br />PROPERTY OWNER <br />